A platform for research: civil engineering, architecture and urbanism
Construction method of building coating decoration engineering
The invention discloses a construction method of building coating decoration engineering, and relates to the technical field of building coating decoration. The method comprises the following steps that S1, the peeling position or the loosening position of a wall surface base layer is removed, ash residues are shoveled away, and the wall surface base layer is cleaned through sweeping; s2, potholes and gaps of the wall surface base layer are filled and leveled with polymer cement mortar, protruding positions are ground off with abrasive paper after drying, and floating dust is swept away; through pretreatment and puttying of the wall surface base layer, the flatness and smoothness of the wall surface are ensured layer by layer, and after subsequent coating, the flatness and smoothness of the wall surface coating are ensured; according to the invention, the material ratio of the putty layer is selected, so that the putty has better overall quality, no cracking, no dusting, no swelling after being affected with damp and water, no slag falling and long service life, and as the coating surface of the coating, the quality of the putty layer ensures the quality of the coating, so that the coating has long service life, and the concept of green and environmental protection is embodied.
本发明公开了一种建筑涂装装饰工程的施工方法,涉及建筑涂装装饰技术领域;本发明包括以下步骤:S1:将墙面基层的起皮处或松动处清除,将灰渣铲干净,并将墙面基层清扫洁净;S2:用聚合物水泥砂浆将墙面基层坑洼、缝隙处填补找平,干燥后用砂纸将凸出处磨掉,将浮尘扫净;本发明对墙面基层的预处理和刮腻子,一层层一步步确保墙面的平整性与光洁性,后续涂覆涂料后,使得墙面涂层的平整度和光洁性都得到了保证;本发明腻子层的材料配比选择,使得腻子整体质量较好,不龟裂,不起粉,受潮受水不膨胀,不掉渣,寿命长,作为涂料的涂覆面,腻子层质量确保了涂层的质量,使得涂层使用寿命长,从而体现了绿色环保的理念。
Construction method of building coating decoration engineering
The invention discloses a construction method of building coating decoration engineering, and relates to the technical field of building coating decoration. The method comprises the following steps that S1, the peeling position or the loosening position of a wall surface base layer is removed, ash residues are shoveled away, and the wall surface base layer is cleaned through sweeping; s2, potholes and gaps of the wall surface base layer are filled and leveled with polymer cement mortar, protruding positions are ground off with abrasive paper after drying, and floating dust is swept away; through pretreatment and puttying of the wall surface base layer, the flatness and smoothness of the wall surface are ensured layer by layer, and after subsequent coating, the flatness and smoothness of the wall surface coating are ensured; according to the invention, the material ratio of the putty layer is selected, so that the putty has better overall quality, no cracking, no dusting, no swelling after being affected with damp and water, no slag falling and long service life, and as the coating surface of the coating, the quality of the putty layer ensures the quality of the coating, so that the coating has long service life, and the concept of green and environmental protection is embodied.
本发明公开了一种建筑涂装装饰工程的施工方法,涉及建筑涂装装饰技术领域;本发明包括以下步骤:S1:将墙面基层的起皮处或松动处清除,将灰渣铲干净,并将墙面基层清扫洁净;S2:用聚合物水泥砂浆将墙面基层坑洼、缝隙处填补找平,干燥后用砂纸将凸出处磨掉,将浮尘扫净;本发明对墙面基层的预处理和刮腻子,一层层一步步确保墙面的平整性与光洁性,后续涂覆涂料后,使得墙面涂层的平整度和光洁性都得到了保证;本发明腻子层的材料配比选择,使得腻子整体质量较好,不龟裂,不起粉,受潮受水不膨胀,不掉渣,寿命长,作为涂料的涂覆面,腻子层质量确保了涂层的质量,使得涂层使用寿命长,从而体现了绿色环保的理念。
Construction method of building coating decoration engineering
一种建筑涂装装饰工程的施工方法
SUN YINBIAO (author)
2022-12-20
Patent
Electronic Resource
Chinese
Construction method of building coating decoration engineering
European Patent Office | 2021
|Building outer wall decoration engineering construction method
European Patent Office | 2023
|European Patent Office | 2021
|Gluing device for building decoration engineering construction
European Patent Office | 2021
|