A platform for research: civil engineering, architecture and urbanism
Ground surface settlement monitoring method suitable for bridge incremental launching process
The invention relates to a ground surface settlement monitoring method suitable for a bridge incremental launching technology, and mainly relates to the technical field of ground surface settlement degree monitoring methods, and the method comprises the following steps: cleaning and cleaning the side wall of a bridge bearing column; reference lines are arranged on the side walls of the bridge bearing columns at the same height in the horizontal direction; a sliding rail is installed on the side wall of the bridge bearing column in the direction perpendicular to the horizontal plane. A settlement module is temporarily fixed to one sliding rail, and a measurement module is temporarily fixed to the other sliding rail; adjusting the relative position of the settlement module and the measurement module, and then fixing the positions of the settlement module and the measurement module; the difference value of the settlement module and the measurement module in the vertical direction is recorded; and repeating the steps 5-7. The method has the advantages that the measurement precision is high, and the bridge incremental launching construction quality can be improved.
本申请涉及一种适用于桥梁顶推工艺的地表沉降监测方法,主要涉及地表沉降度监测方法的技术领域,其包括以下步骤:对桥梁承重柱的侧壁进行清理和清洁;沿水平方向在同一高度在桥梁承重柱的侧壁上设置参考线;沿垂直于水平面的方向桥梁承重柱的侧壁上安装滑轨;将沉降模块临时固定在所述滑轨,将测量模块临时固定在另一所述滑轨;调节所述沉降模块与所述测量模块的相对位置,再对所述沉降模块与所述测量模块进行位置固定;记录所述沉降模块与所述测量模块竖直方向上的差值;重复步骤5‑7。本申请具有测量精度高、有利于提高桥梁顶推施工质量的优点。
Ground surface settlement monitoring method suitable for bridge incremental launching process
The invention relates to a ground surface settlement monitoring method suitable for a bridge incremental launching technology, and mainly relates to the technical field of ground surface settlement degree monitoring methods, and the method comprises the following steps: cleaning and cleaning the side wall of a bridge bearing column; reference lines are arranged on the side walls of the bridge bearing columns at the same height in the horizontal direction; a sliding rail is installed on the side wall of the bridge bearing column in the direction perpendicular to the horizontal plane. A settlement module is temporarily fixed to one sliding rail, and a measurement module is temporarily fixed to the other sliding rail; adjusting the relative position of the settlement module and the measurement module, and then fixing the positions of the settlement module and the measurement module; the difference value of the settlement module and the measurement module in the vertical direction is recorded; and repeating the steps 5-7. The method has the advantages that the measurement precision is high, and the bridge incremental launching construction quality can be improved.
本申请涉及一种适用于桥梁顶推工艺的地表沉降监测方法,主要涉及地表沉降度监测方法的技术领域,其包括以下步骤:对桥梁承重柱的侧壁进行清理和清洁;沿水平方向在同一高度在桥梁承重柱的侧壁上设置参考线;沿垂直于水平面的方向桥梁承重柱的侧壁上安装滑轨;将沉降模块临时固定在所述滑轨,将测量模块临时固定在另一所述滑轨;调节所述沉降模块与所述测量模块的相对位置,再对所述沉降模块与所述测量模块进行位置固定;记录所述沉降模块与所述测量模块竖直方向上的差值;重复步骤5‑7。本申请具有测量精度高、有利于提高桥梁顶推施工质量的优点。
Ground surface settlement monitoring method suitable for bridge incremental launching process
一种适用于桥梁顶推工艺的地表沉降监测方法
GAO HONGZHOU (author) / ZHANG JUNSHENG (author) / CHEN TIANYU (author) / LI FEI (author) / LI HEPING (author) / LIU BOHAN (author) / MENG JIE (author) / SHI HUIMING (author) / SHI FUMING (author) / SU HAOYU (author)
2022-12-23
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Online Contents | 1997
|European Patent Office | 2024
|