A platform for research: civil engineering, architecture and urbanism
Residue-water separation muck pool and construction method thereof
The invention provides a residue-water separation residue soil pool. The residue-water separation residue soil pool comprises a residue soil pool body with an upward opening and a water filtering retaining wall arranged in the residue soil pool body; the muck pool body is arranged on a top plate of the station main body and is composed of a plurality of L-shaped prefabricated retaining walls and backfilled sandy soil; each L-shaped prefabricated retaining wall comprises a transverse face, a vertical face and a triangular chamfer connected to the intersection of the transverse face and the vertical face, the transverse faces are connected with the top plate of the station body, and the vertical faces are perpendicular to the top plate of the station body and form the peripheral wall of the muck pool body. The invention further provides a rapid construction method of the slag-water separation slag pool. The prefabricated retaining wall is used for prefabricating in advance, splicing on site and pouring on site, shield temporary building construction can be completed in advance, the integrity of the muck pool structure can be guaranteed, and the construction quality of the muck pool is improved; and meanwhile, the shield muck is subjected to primary solid-liquid separation through the self-made water filtering retaining wall, and outward transportation of the shield muck is accelerated.
本发明提供了一种渣水分离渣土池,包括具有向上开口的渣土池本体以及设置在渣土池本体内的滤水挡墙;渣土池本体设置在车站主体顶板上,且由多个L型预制挡墙与回填沙土构成;每个L型预制挡墙分别包括横向面、立向面以及连接在二者相交处的三角形倒角,横向面与车站主体顶板相接,立向面垂直于车站主体顶板,并构成渣土池本体的周壁。本发明还提供了一种上述渣水分离渣土池的快速施工方法。本发明利用预制挡墙进行提前预制、现场拼装、现场浇筑,不仅能提前完成盾构临建施工,还能保障渣土池结构的整体性,提高渣土池的施工质量;同时,本发明利用自制滤水挡墙将盾构渣土进行了初步固液分离,加快了盾构渣土的外运。
Residue-water separation muck pool and construction method thereof
The invention provides a residue-water separation residue soil pool. The residue-water separation residue soil pool comprises a residue soil pool body with an upward opening and a water filtering retaining wall arranged in the residue soil pool body; the muck pool body is arranged on a top plate of the station main body and is composed of a plurality of L-shaped prefabricated retaining walls and backfilled sandy soil; each L-shaped prefabricated retaining wall comprises a transverse face, a vertical face and a triangular chamfer connected to the intersection of the transverse face and the vertical face, the transverse faces are connected with the top plate of the station body, and the vertical faces are perpendicular to the top plate of the station body and form the peripheral wall of the muck pool body. The invention further provides a rapid construction method of the slag-water separation slag pool. The prefabricated retaining wall is used for prefabricating in advance, splicing on site and pouring on site, shield temporary building construction can be completed in advance, the integrity of the muck pool structure can be guaranteed, and the construction quality of the muck pool is improved; and meanwhile, the shield muck is subjected to primary solid-liquid separation through the self-made water filtering retaining wall, and outward transportation of the shield muck is accelerated.
本发明提供了一种渣水分离渣土池,包括具有向上开口的渣土池本体以及设置在渣土池本体内的滤水挡墙;渣土池本体设置在车站主体顶板上,且由多个L型预制挡墙与回填沙土构成;每个L型预制挡墙分别包括横向面、立向面以及连接在二者相交处的三角形倒角,横向面与车站主体顶板相接,立向面垂直于车站主体顶板,并构成渣土池本体的周壁。本发明还提供了一种上述渣水分离渣土池的快速施工方法。本发明利用预制挡墙进行提前预制、现场拼装、现场浇筑,不仅能提前完成盾构临建施工,还能保障渣土池结构的整体性,提高渣土池的施工质量;同时,本发明利用自制滤水挡墙将盾构渣土进行了初步固液分离,加快了盾构渣土的外运。
Residue-water separation muck pool and construction method thereof
一种渣水分离渣土池及其施工方法
BI YANZHE (author) / LI JIANQIANG (author) / LUO CHUHUAN (author) / HUANG HUA (author) / WANG DONGDONG (author) / SHENG XIN (author)
2022-12-27
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of muck pool with large-height-difference buttress retaining wall
European Patent Office | 2023
|Expressway roadbed filled with muck construction waste and construction method thereof
European Patent Office | 2022
|Method for preparing active micro powder by utilizing construction waste separation muck
European Patent Office | 2024
|Construction site temporary road construction method based on muck
European Patent Office | 2023
|