A platform for research: civil engineering, architecture and urbanism
Hoisting equipment
The invention discloses hoisting equipment, which comprises a truck crane body, a hoisting device and a hoisting device, the forepoling device comprises a base, a probe beam, a steering pulley and a fixed pulley, an insertion hole is formed in the base, the end, away from the truck crane body, of the telescopic suspension arm is detachably inserted into the insertion hole, one end of the probe beam is connected to the side, away from the telescopic suspension arm, of the base, and the other end of the probe beam is arranged downwards in a deflection mode in the forward extending direction of the telescopic suspension arm; an inclined supporting rod is connected between the base and the probe beam, the steering pulley is installed on the upper portion of the base, the fixed pulley is installed at the other end of the probe beam, one end of a sling of the truck crane body is connected to a winding device of the truck crane body, and the middle of the sling is wound around the steering pulley and the fixed pulley. The other end of the sling is connected with a hook. The problems that a traditional hoisting method is adopted for hoisting high-altitude ALC battens at the bottoms of floor slabs and structural beams, the hoisting efficiency is low, and the input labor cost is large are solved.
本发明公开了一种吊装设备,包括:汽车吊本体,可翻转地安装有伸缩吊臂;前探装置,包括基座、探头梁、转向滑轮和定滑轮,基座形成有插孔,伸缩吊臂的远离汽车吊本体的一端可拆卸地插设于插孔中,探头梁的一端连接于基座的远离伸缩吊臂的一侧,探头梁的另一端沿伸缩吊臂的前伸方向偏转向下设置,探头梁与伸缩吊臂呈角度设置,基座与探头梁之间连接有斜撑杆,转向滑轮安装于基座的上部,定滑轮安装于探头梁的另一端,汽车吊本体的吊索的一端连接于汽车吊本体的收卷装置,吊索的中部缠绕于转向滑轮和定滑轮,吊索的另一端连接有吊钩。本发明解决了在楼板及结构梁的底部的高空ALC条板吊装采用传统吊装方法存在吊装效率低且投入人力成本大的问题。
Hoisting equipment
The invention discloses hoisting equipment, which comprises a truck crane body, a hoisting device and a hoisting device, the forepoling device comprises a base, a probe beam, a steering pulley and a fixed pulley, an insertion hole is formed in the base, the end, away from the truck crane body, of the telescopic suspension arm is detachably inserted into the insertion hole, one end of the probe beam is connected to the side, away from the telescopic suspension arm, of the base, and the other end of the probe beam is arranged downwards in a deflection mode in the forward extending direction of the telescopic suspension arm; an inclined supporting rod is connected between the base and the probe beam, the steering pulley is installed on the upper portion of the base, the fixed pulley is installed at the other end of the probe beam, one end of a sling of the truck crane body is connected to a winding device of the truck crane body, and the middle of the sling is wound around the steering pulley and the fixed pulley. The other end of the sling is connected with a hook. The problems that a traditional hoisting method is adopted for hoisting high-altitude ALC battens at the bottoms of floor slabs and structural beams, the hoisting efficiency is low, and the input labor cost is large are solved.
本发明公开了一种吊装设备,包括:汽车吊本体,可翻转地安装有伸缩吊臂;前探装置,包括基座、探头梁、转向滑轮和定滑轮,基座形成有插孔,伸缩吊臂的远离汽车吊本体的一端可拆卸地插设于插孔中,探头梁的一端连接于基座的远离伸缩吊臂的一侧,探头梁的另一端沿伸缩吊臂的前伸方向偏转向下设置,探头梁与伸缩吊臂呈角度设置,基座与探头梁之间连接有斜撑杆,转向滑轮安装于基座的上部,定滑轮安装于探头梁的另一端,汽车吊本体的吊索的一端连接于汽车吊本体的收卷装置,吊索的中部缠绕于转向滑轮和定滑轮,吊索的另一端连接有吊钩。本发明解决了在楼板及结构梁的底部的高空ALC条板吊装采用传统吊装方法存在吊装效率低且投入人力成本大的问题。
Hoisting equipment
吊装设备
WANG YAOYAO (author) / AN JIAQIANG (author) / YAN JIANG (author) / ZHANG CHONG (author) / YIN SHUYU (author) / WANG SHUAIBIN (author) / YU JIDUO (author) / BAI SHUAI (author) / TANG RUN (author) / GUO XIAODONG (author)
2022-12-30
Patent
Electronic Resource
Chinese
Engineering Index Backfile | 1926
|