A platform for research: civil engineering, architecture and urbanism
Fabricated high-pile wharf structure and construction method thereof
The invention relates to the technical field of ports and wharfs, and discloses a fabricated high-pile wharf structure and a construction method thereof. The fabricated high-pile wharf structure comprises pile foundations and prefabricated box girders, the prefabricated box girders are provided with a plurality of connecting pile holes, the hole diameter of the connecting pile holes is larger than the outer diameter of the pile foundations, the prefabricated box girders are arranged on the pile foundations, the connecting pile holes are used for allowing the pile foundations to be inserted, the prefabricated box girders and the pile foundations are connected and fixed in a pressure grouting mode, and the prefabricated box girders are provided with fender devices. According to the assembly type high-pile wharf structure, the prefabricated box girders are manufactured through standard modules, after the prefabricated box girders and the pile foundations are assembled on a construction site, floating platforms of the prefabricated box girders are used as temporary construction platforms for pile foundation construction, the construction and installation precision of the pile foundations and the prefabricated box girders is high, and large ship machine equipment such as pile driving boats does not need to be dispatched; and the prefabricated box girder and the pile foundation are fixedly connected in a pressure grouting mode, construction is rapid and convenient, the construction condition is improved, and the construction period is shortened.
本发明涉及港口码头技术领域,公开了一种装配式高桩码头结构及其施工方法。本发明的装配式高桩码头结构,包括:桩基和预制箱梁,预制箱梁设有多个连接桩孔,连接桩孔的孔径大于桩基的外径,预制箱梁设置在桩基上,连接桩孔用于供桩基插入,预制箱梁与桩基通过压力灌浆的方式连接固定,预制箱梁设有护舷装置。本发明的装配式高桩码头结构,预制箱梁采用标准化模块制造,在施工现场与桩基装配后,桩基施工利用预制箱梁的浮式平台作为施工临时平台,桩基和预制箱梁的施工安装精度高,无需调遣打桩船等大型船机设备,且通过压力灌浆的方式使预制箱梁与桩基连接固定,施工快捷方便,改善了施工条件,缩短施工周期。
Fabricated high-pile wharf structure and construction method thereof
The invention relates to the technical field of ports and wharfs, and discloses a fabricated high-pile wharf structure and a construction method thereof. The fabricated high-pile wharf structure comprises pile foundations and prefabricated box girders, the prefabricated box girders are provided with a plurality of connecting pile holes, the hole diameter of the connecting pile holes is larger than the outer diameter of the pile foundations, the prefabricated box girders are arranged on the pile foundations, the connecting pile holes are used for allowing the pile foundations to be inserted, the prefabricated box girders and the pile foundations are connected and fixed in a pressure grouting mode, and the prefabricated box girders are provided with fender devices. According to the assembly type high-pile wharf structure, the prefabricated box girders are manufactured through standard modules, after the prefabricated box girders and the pile foundations are assembled on a construction site, floating platforms of the prefabricated box girders are used as temporary construction platforms for pile foundation construction, the construction and installation precision of the pile foundations and the prefabricated box girders is high, and large ship machine equipment such as pile driving boats does not need to be dispatched; and the prefabricated box girder and the pile foundation are fixedly connected in a pressure grouting mode, construction is rapid and convenient, the construction condition is improved, and the construction period is shortened.
本发明涉及港口码头技术领域,公开了一种装配式高桩码头结构及其施工方法。本发明的装配式高桩码头结构,包括:桩基和预制箱梁,预制箱梁设有多个连接桩孔,连接桩孔的孔径大于桩基的外径,预制箱梁设置在桩基上,连接桩孔用于供桩基插入,预制箱梁与桩基通过压力灌浆的方式连接固定,预制箱梁设有护舷装置。本发明的装配式高桩码头结构,预制箱梁采用标准化模块制造,在施工现场与桩基装配后,桩基施工利用预制箱梁的浮式平台作为施工临时平台,桩基和预制箱梁的施工安装精度高,无需调遣打桩船等大型船机设备,且通过压力灌浆的方式使预制箱梁与桩基连接固定,施工快捷方便,改善了施工条件,缩短施工周期。
Fabricated high-pile wharf structure and construction method thereof
一种装配式高桩码头结构及其施工方法
JIANG YI (author) / CHENG ZEKUN (author)
2022-12-30
Patent
Electronic Resource
Chinese
Modular fabricated high-pile wharf structure and construction method thereof
European Patent Office | 2021
|Fabricated high-pile wharf joint and construction method thereof
European Patent Office | 2020
|High pile pier type wharf fabricated abutment structure and construction method thereof
European Patent Office | 2024
|