Method for preventing soil filling of bamboo joint pile core
The invention relates to a method for preventing a bamboo joint pile core from being filled with soil, and relates to the field of bamboo joint pile construction technology.The method for preventing the bamboo joint pile core from being filled with the soil comprises the steps that firstly, before bamboo joint piles are spliced, a plugging column is inserted into the end, away from a to-be-hoisted end of a pile pulling machine, of a pile body pile core; s2, a hand wheel and a rotating shaft are connected through a self-locking mechanism, then the hand wheel is rotated, the hand wheel drives the rotating shaft to rotate, and the rotating shaft can drive a locking mechanism to lock the end, inserted into the pile core of the pile body, of the plugging column; s3, the pile body is lifted through a pile lifting machine, and the pile body is moved to the side close to the pile body in the foundation; and S4, after the pile body is aligned with the pile body in the foundation, the locking state of the locking mechanism is relieved, the plugging column is taken down, and follow-up pile splicing is conducted. The construction method has the effects of effectively blocking the pile core, preventing the pile core from entering soil to bring hidden dangers to subsequent core grouting, and improving the construction efficiency.
本申请涉及一种防止竹节桩桩芯灌土的方法,涉及竹节桩施工技术的领域,竹节桩桩芯灌土的方法S1、首先竹节桩在接桩前,先将封堵柱插接至桩体桩芯远离起桩机待吊装的一端;S2、接着通过自锁机构将手轮与旋转轴进行连接,随后转动手轮,手轮带动旋转轴转动,旋转轴即可带动锁定机构将封堵柱插入桩体桩芯的一端进行锁定;S3、起桩机对桩体进行起吊,并将桩体移动至靠近地基内桩体一侧;S4、待桩体与地基内桩体对齐后,解除锁定机构的锁定状态,并将封堵柱取下,进行后续接桩即可。本申请具有有效封堵桩芯,避免桩芯进土为后续灌芯带来隐患,提高施工效率的效果。
Method for preventing soil filling of bamboo joint pile core
The invention relates to a method for preventing a bamboo joint pile core from being filled with soil, and relates to the field of bamboo joint pile construction technology.The method for preventing the bamboo joint pile core from being filled with the soil comprises the steps that firstly, before bamboo joint piles are spliced, a plugging column is inserted into the end, away from a to-be-hoisted end of a pile pulling machine, of a pile body pile core; s2, a hand wheel and a rotating shaft are connected through a self-locking mechanism, then the hand wheel is rotated, the hand wheel drives the rotating shaft to rotate, and the rotating shaft can drive a locking mechanism to lock the end, inserted into the pile core of the pile body, of the plugging column; s3, the pile body is lifted through a pile lifting machine, and the pile body is moved to the side close to the pile body in the foundation; and S4, after the pile body is aligned with the pile body in the foundation, the locking state of the locking mechanism is relieved, the plugging column is taken down, and follow-up pile splicing is conducted. The construction method has the effects of effectively blocking the pile core, preventing the pile core from entering soil to bring hidden dangers to subsequent core grouting, and improving the construction efficiency.
本申请涉及一种防止竹节桩桩芯灌土的方法,涉及竹节桩施工技术的领域,竹节桩桩芯灌土的方法S1、首先竹节桩在接桩前,先将封堵柱插接至桩体桩芯远离起桩机待吊装的一端;S2、接着通过自锁机构将手轮与旋转轴进行连接,随后转动手轮,手轮带动旋转轴转动,旋转轴即可带动锁定机构将封堵柱插入桩体桩芯的一端进行锁定;S3、起桩机对桩体进行起吊,并将桩体移动至靠近地基内桩体一侧;S4、待桩体与地基内桩体对齐后,解除锁定机构的锁定状态,并将封堵柱取下,进行后续接桩即可。本申请具有有效封堵桩芯,避免桩芯进土为后续灌芯带来隐患,提高施工效率的效果。
Method for preventing soil filling of bamboo joint pile core
一种防止竹节桩桩芯灌土的方法
ZHANG PEISHAN (author) / GAO XING (author) / LONG TIANBAO (author) / CHEN GUANGYU (author) / LI DONGXU (author) / WANG HAO (author) / LIU ZHIGANG (author) / ZHANG JINCHAO (author)
2022-12-30
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen