A platform for research: civil engineering, architecture and urbanism
The invention belongs to the technical field of cofferdams, and particularly relates to a combined cofferdam which is characterized in that a connecting structure and a fixing structure are additionally arranged, a first rotating block is rotated to the position of a concave hole of a first connecting block, a first pull rod is pulled to enable the first rotating block to enter the concave hole, and when a fourth groove is aligned with the first pull rod, the first pull rod is loosened to enable the first rotating block to enter the concave hole; a first pull rod is inserted into a fourth groove after bearing back thrust of a first spring, so that the positions of different weir plates are fixed, the positions of the weir plates and a wave-proof plate are fixed through screwing connection of a bolt and a second rotating block, and a fixing block can be moved up and down by pulling a second pull rod to leave the interior of an inserting rod, so that the wave-proof plate is fixed. When an eighth groove is aligned with a second pull rod, and after the second pull rod is loosened, the second pull rod can be inserted into the eighth groove under the thrust of a second spring, so that a fixing block is fixed, namely, the weir plate is fixed, and a damping structure is additionally arranged, so that the effect of reducing vibration and shaking generated when water waves impact the wave-proof plate can be achieved.
本发明属于围堰技术领域,尤其为一种组合式围堰,通过增加一种连接结构和固定结构,经过第一转动块转动到第一连接块的凹孔位置,拉动第一拉杆,使第一转动块进入到凹孔内部,当第四凹槽与第一拉杆对齐,松开第一拉杆,第一拉杆受到第一弹簧的回推力后,插入第四凹槽内部,从而固定住不同堰板的位置,通过螺栓和第二转动块的旋合式连接,从而固定住堰板与防浪板的位置,通过拉动第二拉杆离开插杆的内部,此时可以上下移动固定块,当第八凹槽对齐第二拉杆,松开第二拉杆后受到第二弹簧的回推力,第二拉杆会插进第八凹槽的内部,从而固定住固定块,也就是固定住堰板,通过增加减震结构,可对水浪冲击防浪板时产生的震动摇晃起到消减的作用。
The invention belongs to the technical field of cofferdams, and particularly relates to a combined cofferdam which is characterized in that a connecting structure and a fixing structure are additionally arranged, a first rotating block is rotated to the position of a concave hole of a first connecting block, a first pull rod is pulled to enable the first rotating block to enter the concave hole, and when a fourth groove is aligned with the first pull rod, the first pull rod is loosened to enable the first rotating block to enter the concave hole; a first pull rod is inserted into a fourth groove after bearing back thrust of a first spring, so that the positions of different weir plates are fixed, the positions of the weir plates and a wave-proof plate are fixed through screwing connection of a bolt and a second rotating block, and a fixing block can be moved up and down by pulling a second pull rod to leave the interior of an inserting rod, so that the wave-proof plate is fixed. When an eighth groove is aligned with a second pull rod, and after the second pull rod is loosened, the second pull rod can be inserted into the eighth groove under the thrust of a second spring, so that a fixing block is fixed, namely, the weir plate is fixed, and a damping structure is additionally arranged, so that the effect of reducing vibration and shaking generated when water waves impact the wave-proof plate can be achieved.
本发明属于围堰技术领域,尤其为一种组合式围堰,通过增加一种连接结构和固定结构,经过第一转动块转动到第一连接块的凹孔位置,拉动第一拉杆,使第一转动块进入到凹孔内部,当第四凹槽与第一拉杆对齐,松开第一拉杆,第一拉杆受到第一弹簧的回推力后,插入第四凹槽内部,从而固定住不同堰板的位置,通过螺栓和第二转动块的旋合式连接,从而固定住堰板与防浪板的位置,通过拉动第二拉杆离开插杆的内部,此时可以上下移动固定块,当第八凹槽对齐第二拉杆,松开第二拉杆后受到第二弹簧的回推力,第二拉杆会插进第八凹槽的内部,从而固定住固定块,也就是固定住堰板,通过增加减震结构,可对水浪冲击防浪板时产生的震动摇晃起到消减的作用。
Combined cofferdam
一种组合式围堰
FENG SHUAI (author)
2022-12-30
Patent
Electronic Resource
Chinese
Combined cofferdam and construction method of combined cofferdam
European Patent Office | 2023
|European Patent Office | 2021
|Steel plate pile and earth dam combined cofferdam and cofferdam construction method
European Patent Office | 2020
|