Construction method of grid type non-cured rubber asphalt composite waterproof system
The invention particularly relates to a construction method of a grid type non-cured rubber asphalt composite waterproof system-waterproof isolation belt. Comprising the steps of 1, base layer cleaning; 2, grid construction axis positioning is carried out; 3, cold primer oil is sprayed to the position where the SBS modified asphalt waterproof coiled material is laid; step 4, acceptance check; step 5, blade coating of non-cured rubber asphalt waterproof paint; step 6, paving SBS (styrene-butadiene-styrene); 7, edge pressing and closing-up are conducted; and step 8, acceptance check. According to the method, the waterproof isolation belt is arranged through the non-cured rubber asphalt waterproof coating, so that large-area brushing of the non-cured rubber asphalt waterproof coating can be reduced gradually, and leaked water can be prevented from transversely penetrating through the grid isolation belt of the non-cured rubber asphalt waterproof coating component; therefore, leaked water is prevented from flowing along the cavity on the concrete base surface on the lower portion of the waterproof roll, large-area repairing of a basement top plate and an outer wall when leakage occurs is avoided, and cost is saved.
本发明具体是一种网格式非固化橡胶沥青复合防水系统—防水隔离带施工方法;包括步骤1、基层清理;步骤2、网格化施工轴线定位;步骤3、铺贴SBS改性沥青防水卷材处喷冷底子油;步骤4、验收;步骤5、刮涂非固化橡胶沥青防水涂料;步骤6、铺贴SBS;步骤7、压边收口;步骤8、验收。本方法通过非固化橡胶沥青防水涂料设置的防水隔离带,既可渐少非固化橡胶沥青防水涂料的大面积涂刷还可以阻挡渗漏的水横穿过非固化橡胶沥青防水涂料构件的网格隔离带,从而杜绝了渗漏水在防水卷材下部的混凝土基面顺空腔部位串流,避免了发生渗漏时,对地库顶板、外墙的大面积修补,节约成本。
Construction method of grid type non-cured rubber asphalt composite waterproof system
The invention particularly relates to a construction method of a grid type non-cured rubber asphalt composite waterproof system-waterproof isolation belt. Comprising the steps of 1, base layer cleaning; 2, grid construction axis positioning is carried out; 3, cold primer oil is sprayed to the position where the SBS modified asphalt waterproof coiled material is laid; step 4, acceptance check; step 5, blade coating of non-cured rubber asphalt waterproof paint; step 6, paving SBS (styrene-butadiene-styrene); 7, edge pressing and closing-up are conducted; and step 8, acceptance check. According to the method, the waterproof isolation belt is arranged through the non-cured rubber asphalt waterproof coating, so that large-area brushing of the non-cured rubber asphalt waterproof coating can be reduced gradually, and leaked water can be prevented from transversely penetrating through the grid isolation belt of the non-cured rubber asphalt waterproof coating component; therefore, leaked water is prevented from flowing along the cavity on the concrete base surface on the lower portion of the waterproof roll, large-area repairing of a basement top plate and an outer wall when leakage occurs is avoided, and cost is saved.
本发明具体是一种网格式非固化橡胶沥青复合防水系统—防水隔离带施工方法;包括步骤1、基层清理;步骤2、网格化施工轴线定位;步骤3、铺贴SBS改性沥青防水卷材处喷冷底子油;步骤4、验收;步骤5、刮涂非固化橡胶沥青防水涂料;步骤6、铺贴SBS;步骤7、压边收口;步骤8、验收。本方法通过非固化橡胶沥青防水涂料设置的防水隔离带,既可渐少非固化橡胶沥青防水涂料的大面积涂刷还可以阻挡渗漏的水横穿过非固化橡胶沥青防水涂料构件的网格隔离带,从而杜绝了渗漏水在防水卷材下部的混凝土基面顺空腔部位串流,避免了发生渗漏时,对地库顶板、外墙的大面积修补,节约成本。
Construction method of grid type non-cured rubber asphalt composite waterproof system
网格式非固化橡胶沥青复合防水系统施工方法
ZHAO ZEZHANG (author) / XU ZIJING (author) / SHENG KAI (author) / LU XIAOKUN (author)
2022-12-30
Patent
Electronic Resource
Chinese
Non-cured rubber asphalt-polyurethane waterproof coating composite construction method
European Patent Office | 2024
|Waterproof leak-repairing construction method using non-cured rubber asphalt waterproof paint
European Patent Office | 2020
|European Patent Office | 2024
|Rubber asphalt waterproof structure and construction method
European Patent Office | 2021
|Non-cured asphalt waterproof structure and construction method thereof
European Patent Office | 2020
|