Steel box girder and installation and construction method thereof
The invention discloses a steel box girder and a mounting construction method thereof, and the steel box girder comprises a plurality of steel box girder assemblies, a positioning mechanism and a driving mechanism. The installation construction method of the steel box girder comprises the steps that any steel box girder assembly is positioned and installed in a designated area, and a second steel box girder assembly is hoisted to be flush with the previous steel box girder assembly; a driving mechanism and a positioning mechanism are installed, and alignment holes in the connecting position of the two steel box girder assemblies are aligned; and the two aligned steel box girder assemblies are fixedly connected, the positioning mechanism and the driving structure are dismounted, and the steel box girder assemblies are put into alignment work of the next steel box girder assembly to be used. Every two adjacent steel box girder assemblies are sequentially aligned through the multiple positioning pieces, the structural design is reasonable, operation is convenient, the positioning mechanism and the driving mechanism can be repeatedly used, and resources are saved.
本发明公开了一种钢箱梁及其安装施工方法,其中,所述钢箱梁包括:多个钢箱梁组件,定位机构和驱动机构。所述钢箱梁的安装施工方法包括:将任一钢箱梁组件定位安装在指定区域,吊起第二个钢箱梁组件至与前一钢箱梁组件齐平;安装驱动机构和定位机构,对两个钢箱梁组件的连接处的对位孔进行对位;将对位好的两个钢箱梁组件进行固结,拆除定位机构和驱动结构,投入下一钢箱梁组件的对位工作中使用。本发明通过多个定位件依次对相邻的两个钢箱梁组件进行对位,结构设计合理,操作方便,所述定位机构和驱动机构可重复利用,节省资源。
Steel box girder and installation and construction method thereof
The invention discloses a steel box girder and a mounting construction method thereof, and the steel box girder comprises a plurality of steel box girder assemblies, a positioning mechanism and a driving mechanism. The installation construction method of the steel box girder comprises the steps that any steel box girder assembly is positioned and installed in a designated area, and a second steel box girder assembly is hoisted to be flush with the previous steel box girder assembly; a driving mechanism and a positioning mechanism are installed, and alignment holes in the connecting position of the two steel box girder assemblies are aligned; and the two aligned steel box girder assemblies are fixedly connected, the positioning mechanism and the driving structure are dismounted, and the steel box girder assemblies are put into alignment work of the next steel box girder assembly to be used. Every two adjacent steel box girder assemblies are sequentially aligned through the multiple positioning pieces, the structural design is reasonable, operation is convenient, the positioning mechanism and the driving mechanism can be repeatedly used, and resources are saved.
本发明公开了一种钢箱梁及其安装施工方法,其中,所述钢箱梁包括:多个钢箱梁组件,定位机构和驱动机构。所述钢箱梁的安装施工方法包括:将任一钢箱梁组件定位安装在指定区域,吊起第二个钢箱梁组件至与前一钢箱梁组件齐平;安装驱动机构和定位机构,对两个钢箱梁组件的连接处的对位孔进行对位;将对位好的两个钢箱梁组件进行固结,拆除定位机构和驱动结构,投入下一钢箱梁组件的对位工作中使用。本发明通过多个定位件依次对相邻的两个钢箱梁组件进行对位,结构设计合理,操作方便,所述定位机构和驱动机构可重复利用,节省资源。
Steel box girder and installation and construction method thereof
钢箱梁及其安装施工方法
ZHANG XIAODONG (author) / LI SHILIN (author) / LI HUINENG (author) / ZHANG HAIGUO (author) / JING WENYUN (author)
2023-01-03
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
CONSTRUCTION GIRDER INSTALLATION DEVICE AND CONSTRUCTION GIRDER INSTALLATION METHOD
European Patent Office | 2018
|Steel box girder installation construction structure and using method thereof
European Patent Office | 2023
|Steel box girder installation construction method of steel structure bridge
European Patent Office | 2024
|