A platform for research: civil engineering, architecture and urbanism
Steel structure frame with splicing function
The invention discloses a steel structure frame with an assembling function. A first supporting frame is fixedly connected to the upper surface of the bottom plate, and a first groove is formed in the inner wall of the first supporting frame. When a worker controls a first connecting plate and a second connecting plate to enter a first connecting groove and a second connecting groove, connection between a transverse plate and a supporting frame is completed, through arrangement of the transverse plate, the supporting effect is achieved when the worker works, the worker can complete work more smoothly, and the working efficiency is improved. When the connecting rod moves into the first groove, the threaded rod starts to move into the second threaded hole from the first threaded hole, connection between the first supporting frame and the second supporting frame is completed, meanwhile, the device can be conveniently disassembled and assembled, it is guaranteed that when the device is assembled, connection between assemblies is more attached and stable, and the service life of the device is prolonged. And meanwhile, the upward height adjusting process of the device can be achieved according to the fact that a connecting rod is placed in a first groove.
本发明公开了一种具有拼装功能的钢结构框架。所述底板的上表面固定连接有第一支撑框,所述第一支撑框的内壁开设有第一凹槽。当工作人员控制第一连接板和第二连接板进入到第一连接凹槽和第二连接凹槽内时,完成对横板与支撑框之间的连接,通过横板的设置,在工作人员进行工作时进行支撑作用,使工作人员在完成工作的过程中更加的顺利,当连接杆移至到第一凹槽内时,螺纹杆开始从第一螺纹孔移至到第二螺纹孔内,完成对第一支撑框和第二支撑框之间的连接,同时本装置不仅可以方便进行拆卸组装,同时保证本装置在进行组装时使组件之间的连接更加的贴合稳定,同时还可以根据第一凹槽内放置连接杆,实现对本装置的向上调高过程。
Steel structure frame with splicing function
The invention discloses a steel structure frame with an assembling function. A first supporting frame is fixedly connected to the upper surface of the bottom plate, and a first groove is formed in the inner wall of the first supporting frame. When a worker controls a first connecting plate and a second connecting plate to enter a first connecting groove and a second connecting groove, connection between a transverse plate and a supporting frame is completed, through arrangement of the transverse plate, the supporting effect is achieved when the worker works, the worker can complete work more smoothly, and the working efficiency is improved. When the connecting rod moves into the first groove, the threaded rod starts to move into the second threaded hole from the first threaded hole, connection between the first supporting frame and the second supporting frame is completed, meanwhile, the device can be conveniently disassembled and assembled, it is guaranteed that when the device is assembled, connection between assemblies is more attached and stable, and the service life of the device is prolonged. And meanwhile, the upward height adjusting process of the device can be achieved according to the fact that a connecting rod is placed in a first groove.
本发明公开了一种具有拼装功能的钢结构框架。所述底板的上表面固定连接有第一支撑框,所述第一支撑框的内壁开设有第一凹槽。当工作人员控制第一连接板和第二连接板进入到第一连接凹槽和第二连接凹槽内时,完成对横板与支撑框之间的连接,通过横板的设置,在工作人员进行工作时进行支撑作用,使工作人员在完成工作的过程中更加的顺利,当连接杆移至到第一凹槽内时,螺纹杆开始从第一螺纹孔移至到第二螺纹孔内,完成对第一支撑框和第二支撑框之间的连接,同时本装置不仅可以方便进行拆卸组装,同时保证本装置在进行组装时使组件之间的连接更加的贴合稳定,同时还可以根据第一凹槽内放置连接杆,实现对本装置的向上调高过程。
Steel structure frame with splicing function
一种具有拼装功能的钢结构框架
XIAO HAOFAN (author)
2023-01-03
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Total splicing jig frame and steel box girder splicing method thereof
European Patent Office | 2023
|European Patent Office | 2023
|Movable steel box girder arc-shaped total splicing jig frame structure
European Patent Office | 2024
|