A platform for research: civil engineering, architecture and urbanism
Hoisting hole material receiving and hole protecting structure and method and transportation system of hoisting hole material receiving and hole protecting structure
The invention discloses a hoisting hole material receiving and hole protecting structure and method and a transporting system thereof.The hoisting hole material receiving and hole protecting structure comprises rails arranged on the two sides of a hoisting channel hole, protective railings arranged on the three side faces of the hoisting channel hole and material receiving devices arranged on the rails, and the material receiving devices are in sliding connection with the two rows of rails; the two rows of rails stride over the hoisting channel hole, one ends of the rails are flush with the edge of the hoisting channel hole, the other ends of the rails extend out of the edge of the hoisting channel hole, the protective railings are located on the outer sides of the two rows of rails and the outer sides of the ends, flush with the hoisting channel hole, of the rails correspondingly, and the material transportation efficiency and the transportation safety are improved.
本发明公开了一种吊装洞口接料兼洞口防护结构、方法及其运输系统,包括设置在吊装通道洞口两侧的轨道,设置在吊装通道洞口三个侧面的防护栏杆,以及设置在轨道上的接料装置,接料装置与两排轨道滑动连接,两排轨道跨在吊装通道洞口上、一端与吊装通道洞口边缘平齐,另一端伸出吊装通道洞口边缘外,防护栏杆分别位于两排轨道的外侧以及轨道与吊装通道洞口平齐的端部的外侧,提高物料运输效率和运输安全性。
Hoisting hole material receiving and hole protecting structure and method and transportation system of hoisting hole material receiving and hole protecting structure
The invention discloses a hoisting hole material receiving and hole protecting structure and method and a transporting system thereof.The hoisting hole material receiving and hole protecting structure comprises rails arranged on the two sides of a hoisting channel hole, protective railings arranged on the three side faces of the hoisting channel hole and material receiving devices arranged on the rails, and the material receiving devices are in sliding connection with the two rows of rails; the two rows of rails stride over the hoisting channel hole, one ends of the rails are flush with the edge of the hoisting channel hole, the other ends of the rails extend out of the edge of the hoisting channel hole, the protective railings are located on the outer sides of the two rows of rails and the outer sides of the ends, flush with the hoisting channel hole, of the rails correspondingly, and the material transportation efficiency and the transportation safety are improved.
本发明公开了一种吊装洞口接料兼洞口防护结构、方法及其运输系统,包括设置在吊装通道洞口两侧的轨道,设置在吊装通道洞口三个侧面的防护栏杆,以及设置在轨道上的接料装置,接料装置与两排轨道滑动连接,两排轨道跨在吊装通道洞口上、一端与吊装通道洞口边缘平齐,另一端伸出吊装通道洞口边缘外,防护栏杆分别位于两排轨道的外侧以及轨道与吊装通道洞口平齐的端部的外侧,提高物料运输效率和运输安全性。
Hoisting hole material receiving and hole protecting structure and method and transportation system of hoisting hole material receiving and hole protecting structure
一种吊装洞口接料兼洞口防护结构、方法及其运输系统
CHEN SHUOHUI (author) / LAN CHUNGUANG (author) / ZHANG YINGJIE (author) / YIN TAIYUE (author) / ZHANG XIAO (author) / HOU XUELI (author) / LIU ZHONGYUAN (author) / LEI HUAXIN (author) / JING GUIEN (author) / QUAN JINDONG (author)
2023-01-03
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Support-free system of box-type foundation hoisting hole and filling method of hoisting hole
European Patent Office | 2020
|Basement hoisting hole sealing structure and construction method
European Patent Office | 2023
|Roof object hanging hole structure with detachable hoisting steel beam
European Patent Office | 2021
|Hoisting device for hoisting central hollow hole prefabricated pile and construction method thereof
European Patent Office | 2020
|