A platform for research: civil engineering, architecture and urbanism
Reservoir regulation and control system based on coordinated control of reservoir inflow and water level in front of dam
The reservoir regulation and control system comprises a dam front platform, a reservoir dam and a water gate assembly, a well mouth downwards extends into the dam front platform to form a lifting well, guide sliding rails are installed at the top end of the lifting platform and the top end of the dam front platform, and sliding seats are installed on the guide sliding rails of the lifting platform in a limiting mode; a hydraulic supply mechanism is mounted at the top end of the sliding seat on one side of the folding detection mechanism, a first hydraulic cylinder is mounted at the top end of the assembly seat on one side of the power box, a signal transmission device is mounted at the top end of the assembly seat on the rear side of the power box, and a movable cover plate is mounted on the end face of an output rod of the first hydraulic cylinder; and an oil supply assembly is mounted on one side of the first hydraulic cylinder. By arranging a series of structures, the water inlet and outlet flow can be calculated according to the displacement and water level change conditions during water gate discharging, the reservoir can be regulated and controlled, detection equipment can be stored and used, hydraulic supply in a total distribution mode is achieved, and regulation and control are convenient.
本发明公开了一种基于入库流量和坝前水位协调控制的水库调控系统,包括坝前平台、水库堤坝和水闸组件,井口向下延伸至坝前平台内部构成升降井,升降平台和坝前平台顶端皆安装有引导滑轨,升降平台的引导滑轨上限位安装有滑座,滑座的顶端安装有折叠检测机构,折叠检测机构一侧的滑座顶端安装有液压供给机构,电源箱一侧的装配座顶端安装有第一液压缸,电源箱后侧的装配座顶端安装有信号传输设备,第一液压缸的输出杆端面安装有活动盖板,第一液压缸的一侧安装有供油组件。本发明通过设置有一系列的结构,可借助水闸排放时的排量和水位变化情况计算出入库流量,进行水库调控,对检测设备进行收纳使用,实现总分形式的液压供给,方便调控。
Reservoir regulation and control system based on coordinated control of reservoir inflow and water level in front of dam
The reservoir regulation and control system comprises a dam front platform, a reservoir dam and a water gate assembly, a well mouth downwards extends into the dam front platform to form a lifting well, guide sliding rails are installed at the top end of the lifting platform and the top end of the dam front platform, and sliding seats are installed on the guide sliding rails of the lifting platform in a limiting mode; a hydraulic supply mechanism is mounted at the top end of the sliding seat on one side of the folding detection mechanism, a first hydraulic cylinder is mounted at the top end of the assembly seat on one side of the power box, a signal transmission device is mounted at the top end of the assembly seat on the rear side of the power box, and a movable cover plate is mounted on the end face of an output rod of the first hydraulic cylinder; and an oil supply assembly is mounted on one side of the first hydraulic cylinder. By arranging a series of structures, the water inlet and outlet flow can be calculated according to the displacement and water level change conditions during water gate discharging, the reservoir can be regulated and controlled, detection equipment can be stored and used, hydraulic supply in a total distribution mode is achieved, and regulation and control are convenient.
本发明公开了一种基于入库流量和坝前水位协调控制的水库调控系统,包括坝前平台、水库堤坝和水闸组件,井口向下延伸至坝前平台内部构成升降井,升降平台和坝前平台顶端皆安装有引导滑轨,升降平台的引导滑轨上限位安装有滑座,滑座的顶端安装有折叠检测机构,折叠检测机构一侧的滑座顶端安装有液压供给机构,电源箱一侧的装配座顶端安装有第一液压缸,电源箱后侧的装配座顶端安装有信号传输设备,第一液压缸的输出杆端面安装有活动盖板,第一液压缸的一侧安装有供油组件。本发明通过设置有一系列的结构,可借助水闸排放时的排量和水位变化情况计算出入库流量,进行水库调控,对检测设备进行收纳使用,实现总分形式的液压供给,方便调控。
Reservoir regulation and control system based on coordinated control of reservoir inflow and water level in front of dam
一种基于入库流量和坝前水位协调控制的水库调控系统
WU XIA (author) / LI XINJIE (author) / SHI SHENGLE (author) / LI JUNJIE (author) / WU XIAOQIAN (author) / FAN ZHANDONG (author) / ZHANG LINGJIE (author) / LIU JINGPO (author) / LIU YARU (author) / MIAO PANPAN (author)
2023-01-13
Patent
Electronic Resource
Chinese
Chaotic Analysis of Reservoir Inflow Series: A Case Study on Koyna Reservoir Inflow
Springer Verlag | 2013
|Reservoir level regulation and control method and system based on water balance
European Patent Office | 2023
|Inflow Dynamics in Brownlee Reservoir
British Library Conference Proceedings | 2004
|Influence of Inflow Prediction on Water Reservoir System Performance
British Library Conference Proceedings | 1998
|SYSTEM AND METHOD FOR PREDICTING INFLOW WATER VOLUME INTO RESERVOIR
European Patent Office | 2016
|