A platform for research: civil engineering, architecture and urbanism
Connecting method for steel pipe supporting rods in slip form construction
The invention provides a connecting method for steel pipe supporting rods in slip-form construction, and relates to the technical field of slip-form construction. The method comprises the steps that S1, a bottom supporting rod is manufactured, the bottom supporting rod comprises a first steel pipe and a first socket short pipe, and the first socket short pipe is fixedly installed at the end of the first steel pipe in a penetrating mode; and S2, a supporting rod is manufactured, the supporting rod comprises a second steel pipe and a second socket short pipe, and the second socket short pipe is fixedly installed at the end of the second steel pipe in a penetrating mode. And S3, a bottom supporting rod is installed, and the first socket short pipe is arranged upwards. And S4, when the jack runs to the upper portion of the first steel pipe, a second steel pipe is fixedly connected to the first socket short pipe in an inserted mode. And S5, when the jack runs to the upper portion of the second steel pipe, the next second steel pipe continues to be fixedly connected to the second socket short pipe in an inserted mode, and the step S5 is repeated till climbing of the sliding formwork is finished. According to the method, the construction cost is saved, the operation time of supporting rod connection is remarkably shortened, the workload of workers is reduced, and the method is an economical, simple, convenient and flexible supporting rod connection mode.
本发明提供一种滑模施工中钢管支撑杆的连接方法,涉及滑模施工技术领域。本方法包括:S1、制作底部支撑杆,底部支撑杆包括第一钢管和第一承插短管,第一承插短管固定穿装在第一钢管端部。S2、制作支撑杆,支撑杆包括第二钢管和第二承插短管,第二承插短管固定穿装在第二钢管端部。S3、安装底部支撑杆,且第一承插短管朝上设置。S4、当千斤顶运行至第一钢管上部时,在第一承插短管上固定插接第二钢管。S5、当千斤顶运行至第二钢管上部时,继续在第二承插短管上固定插接下一个第二钢管,重复S5直至滑模爬升结束。本方法节省施工成本,显著减少了支撑杆连接的操作时间,降低工人工作量,是一种经济、简单、方便、灵活的支撑杆连接方式。
Connecting method for steel pipe supporting rods in slip form construction
The invention provides a connecting method for steel pipe supporting rods in slip-form construction, and relates to the technical field of slip-form construction. The method comprises the steps that S1, a bottom supporting rod is manufactured, the bottom supporting rod comprises a first steel pipe and a first socket short pipe, and the first socket short pipe is fixedly installed at the end of the first steel pipe in a penetrating mode; and S2, a supporting rod is manufactured, the supporting rod comprises a second steel pipe and a second socket short pipe, and the second socket short pipe is fixedly installed at the end of the second steel pipe in a penetrating mode. And S3, a bottom supporting rod is installed, and the first socket short pipe is arranged upwards. And S4, when the jack runs to the upper portion of the first steel pipe, a second steel pipe is fixedly connected to the first socket short pipe in an inserted mode. And S5, when the jack runs to the upper portion of the second steel pipe, the next second steel pipe continues to be fixedly connected to the second socket short pipe in an inserted mode, and the step S5 is repeated till climbing of the sliding formwork is finished. According to the method, the construction cost is saved, the operation time of supporting rod connection is remarkably shortened, the workload of workers is reduced, and the method is an economical, simple, convenient and flexible supporting rod connection mode.
本发明提供一种滑模施工中钢管支撑杆的连接方法,涉及滑模施工技术领域。本方法包括:S1、制作底部支撑杆,底部支撑杆包括第一钢管和第一承插短管,第一承插短管固定穿装在第一钢管端部。S2、制作支撑杆,支撑杆包括第二钢管和第二承插短管,第二承插短管固定穿装在第二钢管端部。S3、安装底部支撑杆,且第一承插短管朝上设置。S4、当千斤顶运行至第一钢管上部时,在第一承插短管上固定插接第二钢管。S5、当千斤顶运行至第二钢管上部时,继续在第二承插短管上固定插接下一个第二钢管,重复S5直至滑模爬升结束。本方法节省施工成本,显著减少了支撑杆连接的操作时间,降低工人工作量,是一种经济、简单、方便、灵活的支撑杆连接方式。
Connecting method for steel pipe supporting rods in slip form construction
滑模施工中钢管支撑杆的连接方法
SHAN HANGQING (author)
2023-01-13
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method for supporting silo top cornice formwork through slip form supporting rods
European Patent Office | 2023
|External inserted cross arm connecting device for steel pipe rods
European Patent Office | 2015
|STEEL PIPE CONNECTING STRUCTURE AND STEEL PIPE CONNECTING METHOD
European Patent Office | 2017
|European Patent Office | 2024
|Double-pipe-rack slip form trolley and double-pipe-rack construction method
European Patent Office | 2021
|