A platform for research: civil engineering, architecture and urbanism
Wading construction boarding and alighting platform structure and wharf boarding and alighting platform structure
The invention relates to and provides a wading construction boarding and alighting platform structure and a wharf boarding and alighting platform structure, the wading construction boarding and alighting platform structure comprises two limiting assemblies, and the two limiting assemblies are in one-to-one correspondence with two adjacent berthing piles and are fixed on the corresponding berthing piles; the first platform is connected between the two limiting assemblies in a sliding manner; the second platform is fixed on one of the berthing piles; one end of the step ladder assembly is hinged to the second platform, and the other end of the step ladder assembly is connected with the first platform in a sliding mode; when the water level changes, the first platform moves upwards or downwards between the two berthing piles through the two limiting assemblies, and when the first platform moves upwards or downwards, the first platform moves upwards or downwards. Under the condition of different water levels, the step ladder assembly can conveniently land on the second platform, so that the berthing pile can be conveniently maintained and overhauled, and meanwhile, the step ladder assembly can conveniently land on a trestle and a wharf from the second platform.
本发明涉及提供了一种涉水施工上下船平台结构及码头上下船平台结构,其包括:两个限位组件,两个所述限位组件与相邻的两个靠船桩一一对应,并固定在对应的靠船桩上;第一平台,所述第一平台滑动连接在两个所述限位组件之间;第二平台,所述第二平台固定在其中一个靠船桩上;步梯组件,所述步梯组件的一端与所述第二平台铰接,所述步梯组件的另一端与所述第一平台滑动连接;在水位变化下,所述第一平台经两个所述限位组件在两个靠船桩之间上移或下移,当所述第一平台上移或下移时。本发明在面对不同水位的情况下,通过步梯组件便于登陆第二平台上,从而便于对靠船桩进行维护检修,同时也能够便于从第二平台登陆栈桥、码头。
Wading construction boarding and alighting platform structure and wharf boarding and alighting platform structure
The invention relates to and provides a wading construction boarding and alighting platform structure and a wharf boarding and alighting platform structure, the wading construction boarding and alighting platform structure comprises two limiting assemblies, and the two limiting assemblies are in one-to-one correspondence with two adjacent berthing piles and are fixed on the corresponding berthing piles; the first platform is connected between the two limiting assemblies in a sliding manner; the second platform is fixed on one of the berthing piles; one end of the step ladder assembly is hinged to the second platform, and the other end of the step ladder assembly is connected with the first platform in a sliding mode; when the water level changes, the first platform moves upwards or downwards between the two berthing piles through the two limiting assemblies, and when the first platform moves upwards or downwards, the first platform moves upwards or downwards. Under the condition of different water levels, the step ladder assembly can conveniently land on the second platform, so that the berthing pile can be conveniently maintained and overhauled, and meanwhile, the step ladder assembly can conveniently land on a trestle and a wharf from the second platform.
本发明涉及提供了一种涉水施工上下船平台结构及码头上下船平台结构,其包括:两个限位组件,两个所述限位组件与相邻的两个靠船桩一一对应,并固定在对应的靠船桩上;第一平台,所述第一平台滑动连接在两个所述限位组件之间;第二平台,所述第二平台固定在其中一个靠船桩上;步梯组件,所述步梯组件的一端与所述第二平台铰接,所述步梯组件的另一端与所述第一平台滑动连接;在水位变化下,所述第一平台经两个所述限位组件在两个靠船桩之间上移或下移,当所述第一平台上移或下移时。本发明在面对不同水位的情况下,通过步梯组件便于登陆第二平台上,从而便于对靠船桩进行维护检修,同时也能够便于从第二平台登陆栈桥、码头。
Wading construction boarding and alighting platform structure and wharf boarding and alighting platform structure
一种涉水施工上下船平台结构及码头上下船平台结构
RUAN MENGFEI (author) / DING JIANSHENG (author) / WANG RUI (author) / CHANG CHENG (author) / HAN MIN (author) / CHI WENKE (author) / LI XUN (author)
2023-01-17
Patent
Electronic Resource
Chinese
Models of bus boarding and alighting dynamics
Elsevier | 2014
|Models of bus boarding and alighting dynamics
Online Contents | 2014
|