Hole construction joint and fabricated building thereof
The invention discloses a hole construction joint and a fabricated building thereof.The hole construction joint comprises an I-shaped beam, the I-shaped beam is installed on a first floor, a first fixing piece and a second fixing piece are arranged on the I-shaped beam, the first fixing piece is arranged on one side of a web of the I-shaped beam, and the second fixing piece is arranged on the other side of the web of the I-shaped beam; one end of the second fixing piece is fixed on the outer side of a lower wing plate of the I-shaped beam; the first bearing piece and the second bearing piece are connected with the first floor slab and a second floor slab, and the second floor slab is located below the first floor slab; the first assembly is respectively connected with the connecting piece and the I-shaped beam and is positioned above the hole; the second assembly is arranged on the side edge of the first assembly, connected with the connecting piece, the first floor slab and the second floor slab and located on the side edge of the hole. According to the tunnel opening construction joint, the construction efficiency can be improved, the cost is saved, and safety and attractiveness are achieved.
本发明公开了洞口施工节点及其装配式建筑,本发明实施例中的洞口施工节点包括:工字梁,所述工字梁安装于第一楼板,所述工字梁上设置有第一固定件以及第二固定件,所述第一固定件设置于所述工字梁的腹板的一侧,所述第二固定件的一端固定于所述工字梁的下翼板的外侧;第一承接件和第二承接件,所述第一承接件和所述第二承接件连接所述第一楼板与第二楼板,所述第二楼板位于所述第一楼板的下方;第一组件,与所述连接件和所述工字梁分别连接并位于洞口上方;第二组件,设置于所述第一组件的侧边,与所述连接件、所述第一楼板以及所述第二楼板分别连接,并位于所述洞口侧边。本发明实施例中的洞口施工节点能够提高施工效率、节约成本且安全美观。
Hole construction joint and fabricated building thereof
The invention discloses a hole construction joint and a fabricated building thereof.The hole construction joint comprises an I-shaped beam, the I-shaped beam is installed on a first floor, a first fixing piece and a second fixing piece are arranged on the I-shaped beam, the first fixing piece is arranged on one side of a web of the I-shaped beam, and the second fixing piece is arranged on the other side of the web of the I-shaped beam; one end of the second fixing piece is fixed on the outer side of a lower wing plate of the I-shaped beam; the first bearing piece and the second bearing piece are connected with the first floor slab and a second floor slab, and the second floor slab is located below the first floor slab; the first assembly is respectively connected with the connecting piece and the I-shaped beam and is positioned above the hole; the second assembly is arranged on the side edge of the first assembly, connected with the connecting piece, the first floor slab and the second floor slab and located on the side edge of the hole. According to the tunnel opening construction joint, the construction efficiency can be improved, the cost is saved, and safety and attractiveness are achieved.
本发明公开了洞口施工节点及其装配式建筑,本发明实施例中的洞口施工节点包括:工字梁,所述工字梁安装于第一楼板,所述工字梁上设置有第一固定件以及第二固定件,所述第一固定件设置于所述工字梁的腹板的一侧,所述第二固定件的一端固定于所述工字梁的下翼板的外侧;第一承接件和第二承接件,所述第一承接件和所述第二承接件连接所述第一楼板与第二楼板,所述第二楼板位于所述第一楼板的下方;第一组件,与所述连接件和所述工字梁分别连接并位于洞口上方;第二组件,设置于所述第一组件的侧边,与所述连接件、所述第一楼板以及所述第二楼板分别连接,并位于所述洞口侧边。本发明实施例中的洞口施工节点能够提高施工效率、节约成本且安全美观。
Hole construction joint and fabricated building thereof
洞口施工节点及其装配式建筑
CUI LIANG (author) / ZHOU YUCHEN (author) / CHEN YANG (author) / GAO LEI (author) / WU BIN (author) / LI WENHAN (author) / CHAO CHEN (author) / LI YUNJIE (author) / ZHANG SHIMENG (author)
2023-01-17
Patent
Electronic Resource
Chinese
Fabricated steel structure building joint and construction method thereof
European Patent Office | 2023
|European Patent Office | 2023
|Fabricated building frame hollow column joint structure and construction method thereof
European Patent Office | 2020
|Fabricated building beam column anti-seismic joint and construction method thereof
European Patent Office | 2024
|Fabricated building steel structure joint and building thereof
European Patent Office | 2024
|