A platform for research: civil engineering, architecture and urbanism
Construction method for prefabricated cover plate of herringbone water interception framework slope protection
A construction method for a prefabricated cover plate of a herringbone water-stopping framework revetment comprises the steps of deepening a structure drawing of the prefabricated cover plate according to the design of the herringbone water-stopping framework revetment, machining the prefabricated cover plate, rechecking and cleaning the slope ratio of a side slope, lofting the position of a herringbone framework, grooving the framework, erecting a framework foundation template and pouring concrete. Mounting side templates of the main framework and the secondary framework, hoisting a prefabricated cover plate, pouring framework concrete, removing the side templates of the main framework and the secondary framework, curing the framework concrete and the like; therefore, the construction scheme that the top cover plate is prefabricated, the side plates on the two sides are erected after the top cover plate is hoisted in place, and finally pouring and filling are conducted is adopted, the problems can be effectively solved, the inverted-Y-shaped water interception framework is smooth in surface and controllable in quality, a stable whole is formed between the inverted-Y-shaped water interception framework and a base, and the framework protection effect is effectively achieved.
一种人字型截水骨架护坡预制盖板施工工法,其包括:根据人字型截水骨架护坡的设计深化预制盖板结构图,预制盖板加工,边坡坡率复核及清理,人字型骨架位置放样,骨架刻槽,骨架基础模板支设及混凝土浇筑,安装主骨架和次骨架的侧模板,预制盖板吊装,骨架混凝土浇筑,主支骨架侧模板拆除,骨架混凝土养护等步骤;由此,本发明采用预制顶部盖板,吊装就位后支设两边侧板,最后浇筑充实的施工方案,可以有效克服以上存在问题,使得人字型截水骨架表面平整、质量可控,与基底间形成稳固整体,有效发挥骨架防护作用。
Construction method for prefabricated cover plate of herringbone water interception framework slope protection
A construction method for a prefabricated cover plate of a herringbone water-stopping framework revetment comprises the steps of deepening a structure drawing of the prefabricated cover plate according to the design of the herringbone water-stopping framework revetment, machining the prefabricated cover plate, rechecking and cleaning the slope ratio of a side slope, lofting the position of a herringbone framework, grooving the framework, erecting a framework foundation template and pouring concrete. Mounting side templates of the main framework and the secondary framework, hoisting a prefabricated cover plate, pouring framework concrete, removing the side templates of the main framework and the secondary framework, curing the framework concrete and the like; therefore, the construction scheme that the top cover plate is prefabricated, the side plates on the two sides are erected after the top cover plate is hoisted in place, and finally pouring and filling are conducted is adopted, the problems can be effectively solved, the inverted-Y-shaped water interception framework is smooth in surface and controllable in quality, a stable whole is formed between the inverted-Y-shaped water interception framework and a base, and the framework protection effect is effectively achieved.
一种人字型截水骨架护坡预制盖板施工工法,其包括:根据人字型截水骨架护坡的设计深化预制盖板结构图,预制盖板加工,边坡坡率复核及清理,人字型骨架位置放样,骨架刻槽,骨架基础模板支设及混凝土浇筑,安装主骨架和次骨架的侧模板,预制盖板吊装,骨架混凝土浇筑,主支骨架侧模板拆除,骨架混凝土养护等步骤;由此,本发明采用预制顶部盖板,吊装就位后支设两边侧板,最后浇筑充实的施工方案,可以有效克服以上存在问题,使得人字型截水骨架表面平整、质量可控,与基底间形成稳固整体,有效发挥骨架防护作用。
Construction method for prefabricated cover plate of herringbone water interception framework slope protection
人字型截水骨架护坡预制盖板施工工法
WANG REN (author) / PAN BIAO (author) / PENG SONG (author) / ZENG JINGXIONG (author) / WANG LIANG (author)
2023-01-24
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
European Patent Office | 2024
|Prefabricated slope protection and construction method thereof
European Patent Office | 2023
|Construction method and device for pouring side slope edging stone and herringbone framework
European Patent Office | 2021
|Prefabricated concrete foundation pit slope protection construction method
European Patent Office | 2022
|