A platform for research: civil engineering, architecture and urbanism
Prefabricated slope protection and construction method thereof
The invention provides a construction method for prefabricated slope protection, which comprises the following steps of: (1) hoisting a connecting piece, determining the positions of other components according to the position of the connecting piece, splicing a torrent groove piece, an arched framework piece and the connecting piece, and then hoisting a broken falling table and a drainage ditch; and (2) laying a three-dimensional net, fixing the three-dimensional net on the slope surface, and covering the three-dimensional net with soil, thereby completing the construction of the prefabricated slope protection. The prefabricated assembly type side slope protection device is provided with the connecting pieces, the prefabricated assembly type side slope protection device is assembled with other components through the connecting pieces, all the components are prefabricated blocks and are installed on site, the site construction efficiency is improved, and meanwhile the side slope has higher stability.
本发明提供一种预制装配式边坡防护的施工方法,包括以下步骤:(1)吊装连接件,根据连接件位置确定其他构件位置,将急流槽件、拱形骨架件与连接件进行拼装,然后再吊装碎落台和排水沟;(2)铺设三维网,并将三维网固定在坡面,用土进行覆盖,即施工完成预制装配式边坡防护。本发明预制装配式边坡防护设有连接件,通过连接件与其他构件装配而成,各部件都为预制块提前做好,在现场进行安装,提高了现场施工效率,同时边坡具有更高的稳定性。
Prefabricated slope protection and construction method thereof
The invention provides a construction method for prefabricated slope protection, which comprises the following steps of: (1) hoisting a connecting piece, determining the positions of other components according to the position of the connecting piece, splicing a torrent groove piece, an arched framework piece and the connecting piece, and then hoisting a broken falling table and a drainage ditch; and (2) laying a three-dimensional net, fixing the three-dimensional net on the slope surface, and covering the three-dimensional net with soil, thereby completing the construction of the prefabricated slope protection. The prefabricated assembly type side slope protection device is provided with the connecting pieces, the prefabricated assembly type side slope protection device is assembled with other components through the connecting pieces, all the components are prefabricated blocks and are installed on site, the site construction efficiency is improved, and meanwhile the side slope has higher stability.
本发明提供一种预制装配式边坡防护的施工方法,包括以下步骤:(1)吊装连接件,根据连接件位置确定其他构件位置,将急流槽件、拱形骨架件与连接件进行拼装,然后再吊装碎落台和排水沟;(2)铺设三维网,并将三维网固定在坡面,用土进行覆盖,即施工完成预制装配式边坡防护。本发明预制装配式边坡防护设有连接件,通过连接件与其他构件装配而成,各部件都为预制块提前做好,在现场进行安装,提高了现场施工效率,同时边坡具有更高的稳定性。
Prefabricated slope protection and construction method thereof
一种预制装配式边坡防护及其施工方法
XIE ZHAOYU (author) / ZHU DONGLIANG (author) / LIU CHAOHUI (author) / LI CHANGDONG (author) / PAN YANGHANG (author) / YU WEIJUN (author) / MING MENG (author) / GU DONGMING (author) / ZHANG FENG (author) / LI TAO (author)
2023-11-17
Patent
Electronic Resource
Chinese
Prefabricated ecological protection slope and construction method thereof
European Patent Office | 2022
|Fabricated prefabricated slope protection device and construction method thereof
European Patent Office | 2021
|Prefabricated ecological brick slope protection structure and construction method thereof
European Patent Office | 2020
|Prefabricated ecological brick slope protection structure and construction method thereof
European Patent Office | 2024
|Prefabricated concrete foundation pit slope protection construction method
European Patent Office | 2022
|