Pier column construction technology
The invention discloses a pier column construction technology, and relates to the technical field of bridge building construction, and the pier column construction technology comprises the following steps: S1, surveying and setting out: setting out a side line, a center line and a steel mold position line of a pier body on the top surface of a bearing platform; s2, chiseling the top surface of the bearing platform; s3, the segmented reinforcement cages are installed, the number of the segmented reinforcement cages is not smaller than two, a limiting assembly is installed between every two adjacent segmented reinforcement cages, and every two adjacent segmented reinforcement cages are connected in an opposite mode through the limiting assemblies; s4, steel molds are installed, specifically, the steel molds are installed at the positions of the steel mold position lines, and the number of the steel molds corresponds to the number of the segmented reinforcement cages; s5, concrete is poured and vibrated; and S6, pier body concrete curing. The device has the effects that the adjacent reinforcement cages can be quickly positioned and connected, and the construction and production efficiency of the pier column is improved.
本申请公开了一种墩柱施工工艺,涉及桥梁建筑施工技术领域,其包括以下步骤:S1,测量放样,在承台顶面定出墩身的边线、中线以及钢模位置线;S2,承台顶面凿毛;S3,安装分段钢筋笼,分段钢筋笼的数量不少于两组,相邻的分段钢筋笼之间安装限位组件,通过限位组件使相邻的两组分段钢筋笼正对连接;S4,安装钢模,在钢模位置线的位置上安装钢模,钢模的数量和分段钢筋笼对应设置;S5,混凝土浇筑和振捣;S6,墩身混凝土养护。本申请具有使相邻的钢筋笼快速实现定位连接,提高墩柱施工生产效率的效果。
Pier column construction technology
The invention discloses a pier column construction technology, and relates to the technical field of bridge building construction, and the pier column construction technology comprises the following steps: S1, surveying and setting out: setting out a side line, a center line and a steel mold position line of a pier body on the top surface of a bearing platform; s2, chiseling the top surface of the bearing platform; s3, the segmented reinforcement cages are installed, the number of the segmented reinforcement cages is not smaller than two, a limiting assembly is installed between every two adjacent segmented reinforcement cages, and every two adjacent segmented reinforcement cages are connected in an opposite mode through the limiting assemblies; s4, steel molds are installed, specifically, the steel molds are installed at the positions of the steel mold position lines, and the number of the steel molds corresponds to the number of the segmented reinforcement cages; s5, concrete is poured and vibrated; and S6, pier body concrete curing. The device has the effects that the adjacent reinforcement cages can be quickly positioned and connected, and the construction and production efficiency of the pier column is improved.
本申请公开了一种墩柱施工工艺,涉及桥梁建筑施工技术领域,其包括以下步骤:S1,测量放样,在承台顶面定出墩身的边线、中线以及钢模位置线;S2,承台顶面凿毛;S3,安装分段钢筋笼,分段钢筋笼的数量不少于两组,相邻的分段钢筋笼之间安装限位组件,通过限位组件使相邻的两组分段钢筋笼正对连接;S4,安装钢模,在钢模位置线的位置上安装钢模,钢模的数量和分段钢筋笼对应设置;S5,混凝土浇筑和振捣;S6,墩身混凝土养护。本申请具有使相邻的钢筋笼快速实现定位连接,提高墩柱施工生产效率的效果。
Pier column construction technology
一种墩柱施工工艺
SONG JUWANG (author) / ZHANG QINGNAN (author) / WANG YANTAO (author) / WANG GANGJUN (author) / FAN JUNZI (author) / XIE XING (author) / ZHOU XUN (author) / ZHANG FUWANG (author)
2023-01-31
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2023
|Pier column construction method and pier column template
European Patent Office | 2015
|