The invention discloses a steel sleeve construction method for a connecting joint of a concrete column and a steel beam. The steel sleeve construction method comprises the following steps that 1, the elevation of the junction is confirmed; 2, steel bar blanking and binding are conducted according to the elevation, confirmed in the step 1, of the junction; 3, shear-resistant profile steel and embedded parts are installed; 4, constructing and reinforcing a column formwork; 5, concrete is poured to the interface; sixthly, an upper steel sleeve and a bracket are installed; 7, pouring concrete in the steel sleeve; 8, binding the steel sleeve with a concrete beam steel bar; the construction method has the advantages of being good in stress performance, simple in structure and convenient to construct, good technical and economic benefits are achieved, the concrete pouring quality is guaranteed, and the strength and ductility of the concrete are improved.
本发明公开了一种用于混凝土柱与钢梁连接节点的钢套筒施工方法,包括以下步骤:步骤1交界处标高确认;步骤2根据步骤1中确认的交界处的标高,进行钢筋下料及绑扎;步骤3安装抗剪型钢及埋件;步骤4柱模板施工及加固;步骤5浇筑混凝土至交界面;步骤6安装上部钢套筒及牛腿;步骤7浇筑钢套管内混凝土;步骤8钢套管与混凝土梁钢筋绑扎;步骤9钢套筒与钢梁连接,本发明具有受力性能良好、构造简单,施工方便的特点,且具有良好的技术经济效益,保证混凝土浇筑的质量,提高其强度及延性。
Steel sleeve construction method for connecting joint of concrete column and steel beam
The invention discloses a steel sleeve construction method for a connecting joint of a concrete column and a steel beam. The steel sleeve construction method comprises the following steps that 1, the elevation of the junction is confirmed; 2, steel bar blanking and binding are conducted according to the elevation, confirmed in the step 1, of the junction; 3, shear-resistant profile steel and embedded parts are installed; 4, constructing and reinforcing a column formwork; 5, concrete is poured to the interface; sixthly, an upper steel sleeve and a bracket are installed; 7, pouring concrete in the steel sleeve; 8, binding the steel sleeve with a concrete beam steel bar; the construction method has the advantages of being good in stress performance, simple in structure and convenient to construct, good technical and economic benefits are achieved, the concrete pouring quality is guaranteed, and the strength and ductility of the concrete are improved.
本发明公开了一种用于混凝土柱与钢梁连接节点的钢套筒施工方法,包括以下步骤:步骤1交界处标高确认;步骤2根据步骤1中确认的交界处的标高,进行钢筋下料及绑扎;步骤3安装抗剪型钢及埋件;步骤4柱模板施工及加固;步骤5浇筑混凝土至交界面;步骤6安装上部钢套筒及牛腿;步骤7浇筑钢套管内混凝土;步骤8钢套管与混凝土梁钢筋绑扎;步骤9钢套筒与钢梁连接,本发明具有受力性能良好、构造简单,施工方便的特点,且具有良好的技术经济效益,保证混凝土浇筑的质量,提高其强度及延性。
Steel sleeve construction method for connecting joint of concrete column and steel beam
一种用于混凝土柱与钢梁连接节点的钢套筒施工方法
LI XUBING (author) / WANG CHENHUI (author) / WANG XUEMIN (author) / HOU DAWEI (author) / GUO SHICHENG (author)
2023-01-31
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Fabricated reinforced concrete column and steel beam connecting joint with sleeve
European Patent Office | 2021
|European Patent Office | 2022
|Prefabricated steel pipe concrete column type steel beam connecting joint and construction method
European Patent Office | 2023
|Steel-concrete structure beam-column joint connecting method
European Patent Office | 2024
|European Patent Office | 2021
|