A platform for research: civil engineering, architecture and urbanism
Building wall and construction method thereof
The invention relates to the technical field of building wall construction, in particular to a building wall and a construction method thereof.The building wall comprises a load-bearing wall body and a mortar layer on one side of the load-bearing wall body, a plurality of curtain wall hanging plates are fixedly arranged on the other side of the load-bearing wall body, and a plurality of mounting bases are arranged on the sides, close to the load-bearing wall body, of the opposite faces of the curtain wall hanging plates; a waterproof connecting piece is arranged between the mounting base and the curtain wall hanging plate, a plurality of heat preservation rock wool plates are fixedly arranged on one side of the mortar layer, a heat preservation assembly is arranged between one side of each heat preservation rock wool plate and the load-bearing wall body, and the waterproof connecting piece mainly prevents rainwater from permeating into the load-bearing wall body while guaranteeing stability of the curtain wall hanging plate. And main embedded parts can be prevented from making contact with rainwater, the heat preservation assembly arranged inside introduces external hot air or cold air through a gas cavity, a plurality of independent sealing cavities are formed between the heat preservation rock wool board and the bearing wall body, the indoor prolonging time is prolonged, and rapid loss is avoided.
本发明涉及建筑墙体施工技术领域,具体涉及一种建筑墙体及其施工方法,包括:承重墙体和承重墙体一侧的砂浆层,承重墙体的另一侧固定设置有多个幕墙挂板,幕墙挂板的相对面靠近承重墙体的一侧设置有多个安装座;安装座和幕墙挂板之间设置有防水连接件,砂浆层一侧固定设置有多个保温岩棉板,保温岩棉板的一侧与承重墙体之间设置有保温组件,防水连接件在保证幕墙挂板稳定的同时,主要防止雨水渗入承重墙体内部,并且能够避免主要的预埋件与雨水接触,而内部设置的保温组件,通过气体腔将外部热气或冷气引入,在保温岩棉板与承重墙体之间形成多个单独的密封腔,增加在室内的延长时间,避免快速流失。
Building wall and construction method thereof
The invention relates to the technical field of building wall construction, in particular to a building wall and a construction method thereof.The building wall comprises a load-bearing wall body and a mortar layer on one side of the load-bearing wall body, a plurality of curtain wall hanging plates are fixedly arranged on the other side of the load-bearing wall body, and a plurality of mounting bases are arranged on the sides, close to the load-bearing wall body, of the opposite faces of the curtain wall hanging plates; a waterproof connecting piece is arranged between the mounting base and the curtain wall hanging plate, a plurality of heat preservation rock wool plates are fixedly arranged on one side of the mortar layer, a heat preservation assembly is arranged between one side of each heat preservation rock wool plate and the load-bearing wall body, and the waterproof connecting piece mainly prevents rainwater from permeating into the load-bearing wall body while guaranteeing stability of the curtain wall hanging plate. And main embedded parts can be prevented from making contact with rainwater, the heat preservation assembly arranged inside introduces external hot air or cold air through a gas cavity, a plurality of independent sealing cavities are formed between the heat preservation rock wool board and the bearing wall body, the indoor prolonging time is prolonged, and rapid loss is avoided.
本发明涉及建筑墙体施工技术领域,具体涉及一种建筑墙体及其施工方法,包括:承重墙体和承重墙体一侧的砂浆层,承重墙体的另一侧固定设置有多个幕墙挂板,幕墙挂板的相对面靠近承重墙体的一侧设置有多个安装座;安装座和幕墙挂板之间设置有防水连接件,砂浆层一侧固定设置有多个保温岩棉板,保温岩棉板的一侧与承重墙体之间设置有保温组件,防水连接件在保证幕墙挂板稳定的同时,主要防止雨水渗入承重墙体内部,并且能够避免主要的预埋件与雨水接触,而内部设置的保温组件,通过气体腔将外部热气或冷气引入,在保温岩棉板与承重墙体之间形成多个单独的密封腔,增加在室内的延长时间,避免快速流失。
Building wall and construction method thereof
一种建筑墙体及其施工方法
MIAO JIAJI (author) / ZHOU YAHUA (author) / ZHU YANHONG (author) / LU WEIWEI (author) / WANG LILI (author) / CAO YONGCHENG (author)
2023-01-31
Patent
Electronic Resource
Chinese
Building wall building construction system and construction method thereof
European Patent Office | 2021
|Building wall curtain wall construction device and construction method thereof
European Patent Office | 2023
|