A platform for research: civil engineering, architecture and urbanism
Rail crossing device capable of being manually and rapidly assembled and withdrawn
The embodiment of the invention provides rail crossing equipment capable of being manually and rapidly assembled and withdrawn. The rail crossing equipment comprises a lane plate, supporting legs, a cross beam and an end plate. First pins are arranged at the top ends of the supporting legs. The cross beam can be placed on the supporting legs, first holes are formed in the bottom face of the cross beam, the first pins are inserted into the first holes and matched with the first holes, the bottom face of the cross beam is attached to the upper surfaces of the supporting legs, and second pins are arranged on the upper surface of the cross beam. Second holes are formed in the bottom faces of the ends of the lane plates, the ends of the two lane plates abut against each other, the abutting position can be correspondingly placed on the cross beam, second pins can be inserted into the second holes in the bottom faces of the ends of the two lane plates and matched with the second holes, and the bottom faces of the ends of the lane plates are attached to the upper surface of the cross beam. The end plate comprises a slope part and a connecting part, third pins are arranged on the upper surface of the connecting part, the end plate is used for being connected with a lane plate in lap joint with the platform side, the slope part abuts against the lane plate and is in lap joint with the end of the platform side, and the slope of the slope part is connected with the upper surface of the lane plate. The third pin can be inserted into a second hole in the bottom face of the end, lapped to the platform side, of the lane plate and is matched with the second hole.
本申请实施例提供了一种可人工快速拼装撤收的过轨器材,包括:车道板、支腿、横梁和端头板;其中,支腿顶端设置有第一销钉;横梁能够搁置于支腿上,横梁底面开设有第一孔洞,第一销钉插入第一孔洞并与第一孔洞配合,横梁底面与支腿上表面贴合,横梁的上表面设置有第二销钉;车道板端部底面开设有第二孔洞,两块车道板端部相抵,抵接处能够对应搁置于横梁上,第二销钉能够插入两块车道板端部底面的第二孔洞并与第二孔洞配合,车道板端部底面与横梁上表面贴合;端头板包括斜坡部和连接部,连接部上表面设置有第三销钉,端头板用于连接搭接于站台侧的车道板,斜坡部抵接车道板搭接于站台侧的端部,斜坡部的斜面与车道板的上表面相连,第三销钉能够插入车道板搭接于站台侧的端部底面的第二孔洞并与第二孔洞配合。
Rail crossing device capable of being manually and rapidly assembled and withdrawn
The embodiment of the invention provides rail crossing equipment capable of being manually and rapidly assembled and withdrawn. The rail crossing equipment comprises a lane plate, supporting legs, a cross beam and an end plate. First pins are arranged at the top ends of the supporting legs. The cross beam can be placed on the supporting legs, first holes are formed in the bottom face of the cross beam, the first pins are inserted into the first holes and matched with the first holes, the bottom face of the cross beam is attached to the upper surfaces of the supporting legs, and second pins are arranged on the upper surface of the cross beam. Second holes are formed in the bottom faces of the ends of the lane plates, the ends of the two lane plates abut against each other, the abutting position can be correspondingly placed on the cross beam, second pins can be inserted into the second holes in the bottom faces of the ends of the two lane plates and matched with the second holes, and the bottom faces of the ends of the lane plates are attached to the upper surface of the cross beam. The end plate comprises a slope part and a connecting part, third pins are arranged on the upper surface of the connecting part, the end plate is used for being connected with a lane plate in lap joint with the platform side, the slope part abuts against the lane plate and is in lap joint with the end of the platform side, and the slope of the slope part is connected with the upper surface of the lane plate. The third pin can be inserted into a second hole in the bottom face of the end, lapped to the platform side, of the lane plate and is matched with the second hole.
本申请实施例提供了一种可人工快速拼装撤收的过轨器材,包括:车道板、支腿、横梁和端头板;其中,支腿顶端设置有第一销钉;横梁能够搁置于支腿上,横梁底面开设有第一孔洞,第一销钉插入第一孔洞并与第一孔洞配合,横梁底面与支腿上表面贴合,横梁的上表面设置有第二销钉;车道板端部底面开设有第二孔洞,两块车道板端部相抵,抵接处能够对应搁置于横梁上,第二销钉能够插入两块车道板端部底面的第二孔洞并与第二孔洞配合,车道板端部底面与横梁上表面贴合;端头板包括斜坡部和连接部,连接部上表面设置有第三销钉,端头板用于连接搭接于站台侧的车道板,斜坡部抵接车道板搭接于站台侧的端部,斜坡部的斜面与车道板的上表面相连,第三销钉能够插入车道板搭接于站台侧的端部底面的第二孔洞并与第二孔洞配合。
Rail crossing device capable of being manually and rapidly assembled and withdrawn
一种可人工快速拼装撤收的过轨器材
WANG RUIJUN (author) / YANG ZHIPING (author) / XIONG ZHI (author) / LU HENG (author) / SHANG WENLONG (author) / WANG TIAN (author) / HU DAHU (author) / SONG ZHIMIN (author) / CHEN SIHANG (author)
2023-02-03
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
European Patent Office | 2019
|Rail device capable of being rapidly installed and detached
European Patent Office | 2015
|Handle device capable of being rapidly disassembled and assembled
European Patent Office | 2020
|Assembled flood control system capable of being automatically or manually opened and closed
European Patent Office | 2023
|