A platform for research: civil engineering, architecture and urbanism
Passing hose construction integrated trolley in pavement reconstruction process
The invention relates to the field of urban road reconstruction, in particular to a road passing hose construction integrated trolley in the road surface reconstruction process, which comprises a trolley body, a driving motor is arranged at the front end of the trolley body, a grooving device is arranged at the output end of the driving motor, and a spiral conveyor is arranged on the rear side of the grooving device. The spiral conveyor is connected with a muck recycling bin arranged in the trolley body; a hose storage bin is arranged in the middle of the trolley body; a concrete storage bin is arranged on the rear side of the hose storage bin, and a vibrator is arranged on the rear side of the concrete storage bin. According to the device, grooving, slag removing, pipe distributing, pouring and vibrating integrated construction can be achieved, dust pollution generated by construction is completely eradicated, manual participation in construction is avoided, the labor intensity is reduced, meanwhile, continuous construction is conducted through the integrated trolley, and the construction efficiency can be improved.
本发明涉及城市道路改造领域,尤其是一种路面改造过程中过路软管施工集成小车,包括小车本体,小车本体的前端设置有驱动电机,驱动电机的输出端设置有开槽器,开槽器的后侧设置有螺旋输料器,螺旋输料器与小车本体内部设置的渣土回收仓连接;小车本体的中部设置有软管储存仓;软管储存仓的后侧设置有混凝土储存仓,混凝土储存仓的后侧设置有振捣器。本发明能够开槽、清渣、布管、浇筑、振捣一体施工,杜绝施工产生的粉尘污染,避免人工参与施工,降低了劳动强度,同时利用集成小车连贯施工,有助于提高施工效率。
Passing hose construction integrated trolley in pavement reconstruction process
The invention relates to the field of urban road reconstruction, in particular to a road passing hose construction integrated trolley in the road surface reconstruction process, which comprises a trolley body, a driving motor is arranged at the front end of the trolley body, a grooving device is arranged at the output end of the driving motor, and a spiral conveyor is arranged on the rear side of the grooving device. The spiral conveyor is connected with a muck recycling bin arranged in the trolley body; a hose storage bin is arranged in the middle of the trolley body; a concrete storage bin is arranged on the rear side of the hose storage bin, and a vibrator is arranged on the rear side of the concrete storage bin. According to the device, grooving, slag removing, pipe distributing, pouring and vibrating integrated construction can be achieved, dust pollution generated by construction is completely eradicated, manual participation in construction is avoided, the labor intensity is reduced, meanwhile, continuous construction is conducted through the integrated trolley, and the construction efficiency can be improved.
本发明涉及城市道路改造领域,尤其是一种路面改造过程中过路软管施工集成小车,包括小车本体,小车本体的前端设置有驱动电机,驱动电机的输出端设置有开槽器,开槽器的后侧设置有螺旋输料器,螺旋输料器与小车本体内部设置的渣土回收仓连接;小车本体的中部设置有软管储存仓;软管储存仓的后侧设置有混凝土储存仓,混凝土储存仓的后侧设置有振捣器。本发明能够开槽、清渣、布管、浇筑、振捣一体施工,杜绝施工产生的粉尘污染,避免人工参与施工,降低了劳动强度,同时利用集成小车连贯施工,有助于提高施工效率。
Passing hose construction integrated trolley in pavement reconstruction process
路面改造过程中过路软管施工集成小车
CUI JIANG (author) / PAN JIAN (author) / ZUO MEIXI (author) / ZHU FUQIANG (author) / LIU DONGSHENG (author)
2023-02-03
Patent
Electronic Resource
Chinese
Trolley coaches cause pavement wear
Engineering Index Backfile | 1950
|Roof purline installation integrated construction trolley
European Patent Office | 2024
|