A platform for research: civil engineering, architecture and urbanism
Semi-permeable concrete precast pile construction structure and construction method thereof
The invention discloses a semi-permeable concrete precast pile construction structure and a construction method thereof. The construction structure comprises a pit body and a plurality of semi-permeable concrete precast piles. The multiple semi-permeable concrete precast piles are sequentially arranged along the edge of the pit body, each semi-permeable concrete precast pile is sequentially provided with a supporting concrete pile part and a first permeable concrete pile part in the vertical length direction, and the supporting concrete pile parts are located on the side close to the pit body. In the semi-permeable composite concrete precast pile construction structure, the supporting concrete pile part is located on the side close to the pit body to achieve the supporting effect, the first permeable concrete pile part is located on the side away from the pit body to achieve the effect of permeating water and providing a water flowing channel for underground water, and the influence of underground engineering on underground water flowing is reduced.
本申请公开一种半透水混凝土预制桩施工结构及其施工方法,施工结构包括坑体、多个半透水混凝土预制桩。多个半透水混凝土预制桩沿坑体的边沿依次设置,各半透水混凝土预制桩均沿垂直长度的方向依次设置有支护混凝土桩部和第一透水混凝土桩部,所述支护混凝土桩部位于靠近所述坑体的一侧。本申请的半透水复合混凝土预制桩施工结构中,支护混凝土桩部位于靠近所述坑体的一侧起到支护效果,第一透水混凝土桩部位于背离坑体的一侧,起到透水为地下水提供流水通道的作用,降低了地下工程对地下水流动的影响。
Semi-permeable concrete precast pile construction structure and construction method thereof
The invention discloses a semi-permeable concrete precast pile construction structure and a construction method thereof. The construction structure comprises a pit body and a plurality of semi-permeable concrete precast piles. The multiple semi-permeable concrete precast piles are sequentially arranged along the edge of the pit body, each semi-permeable concrete precast pile is sequentially provided with a supporting concrete pile part and a first permeable concrete pile part in the vertical length direction, and the supporting concrete pile parts are located on the side close to the pit body. In the semi-permeable composite concrete precast pile construction structure, the supporting concrete pile part is located on the side close to the pit body to achieve the supporting effect, the first permeable concrete pile part is located on the side away from the pit body to achieve the effect of permeating water and providing a water flowing channel for underground water, and the influence of underground engineering on underground water flowing is reduced.
本申请公开一种半透水混凝土预制桩施工结构及其施工方法,施工结构包括坑体、多个半透水混凝土预制桩。多个半透水混凝土预制桩沿坑体的边沿依次设置,各半透水混凝土预制桩均沿垂直长度的方向依次设置有支护混凝土桩部和第一透水混凝土桩部,所述支护混凝土桩部位于靠近所述坑体的一侧。本申请的半透水复合混凝土预制桩施工结构中,支护混凝土桩部位于靠近所述坑体的一侧起到支护效果,第一透水混凝土桩部位于背离坑体的一侧,起到透水为地下水提供流水通道的作用,降低了地下工程对地下水流动的影响。
Semi-permeable concrete precast pile construction structure and construction method thereof
一种半透水混凝土预制桩施工结构及其施工方法
CHEN JIAN (author) / BAI YIFAN (author) / ZHAO LIANSHENG (author) / CAO FENGJIE (author) / GUO JIE (author) / LIU XIAOQING (author) / REN ZHICHENG (author) / LI BENYOU (author) / QIAO NAN (author) / ZHANG DONGDONG (author)
2023-02-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile sinking equipment for concrete precast pile construction and construction method thereof
European Patent Office | 2024
|Precast pile construction method and precast pile construction equipment
European Patent Office | 2021
|Concrete precast pile connecting device and construction method thereof
European Patent Office | 2020
|