A platform for research: civil engineering, architecture and urbanism
Pile sinking equipment for concrete precast pile construction and construction method thereof
The invention discloses pile sinking equipment for concrete precast pile construction, and relates to the technical field of building construction, the pile sinking equipment comprises a pile sinking mechanism, an auxiliary mechanism is arranged on the pile sinking mechanism, the auxiliary mechanism comprises a rectangular plate, and two symmetrical trapezoidal blocks are fixed to the top of the rectangular plate; the opposite sides of the two trapezoidal blocks are each provided with two electric push rods, an auxiliary wheel is rotationally connected between the interiors of each set of first hollow blocks through a first bearing, and the interiors of six second hollow blocks are rotationally connected with female clamping blocks through second bearings. And the interiors of the other six second hollow blocks are rotationally connected with sub clamping blocks through third bearings. By arranging the auxiliary mechanism, the concrete precast pile can be rapidly and stably conveyed into the pile sinking equipment, the building construction efficiency is improved, and meanwhile the use efficiency of the pile sinking equipment is improved.
本发明公开了一种混凝土预制桩施工沉桩设备,涉及建筑施工技术领域,包括沉桩机构,所述沉桩机构上设置有辅助机构,所述辅助机构包括矩形板,所述矩形板的顶部固定有两个相对称的梯形块,两个所述梯形块的相对一侧均安装有两个电动推杆,每组所述第一空心块的内部之间均通过第一轴承转动连接有辅助轮,其中六个所述第二空心块的内部均通过第二轴承转动连接有母卡块,另外六个所述第二空心块的内部均通过第三轴承转动连接有子卡块。本发明通过设置辅助机构,可以让混凝土预制桩快速且稳定地送到沉桩设备的内部,既提高建筑施工的效率,同时也提高了沉桩设备的使用效率。
Pile sinking equipment for concrete precast pile construction and construction method thereof
The invention discloses pile sinking equipment for concrete precast pile construction, and relates to the technical field of building construction, the pile sinking equipment comprises a pile sinking mechanism, an auxiliary mechanism is arranged on the pile sinking mechanism, the auxiliary mechanism comprises a rectangular plate, and two symmetrical trapezoidal blocks are fixed to the top of the rectangular plate; the opposite sides of the two trapezoidal blocks are each provided with two electric push rods, an auxiliary wheel is rotationally connected between the interiors of each set of first hollow blocks through a first bearing, and the interiors of six second hollow blocks are rotationally connected with female clamping blocks through second bearings. And the interiors of the other six second hollow blocks are rotationally connected with sub clamping blocks through third bearings. By arranging the auxiliary mechanism, the concrete precast pile can be rapidly and stably conveyed into the pile sinking equipment, the building construction efficiency is improved, and meanwhile the use efficiency of the pile sinking equipment is improved.
本发明公开了一种混凝土预制桩施工沉桩设备,涉及建筑施工技术领域,包括沉桩机构,所述沉桩机构上设置有辅助机构,所述辅助机构包括矩形板,所述矩形板的顶部固定有两个相对称的梯形块,两个所述梯形块的相对一侧均安装有两个电动推杆,每组所述第一空心块的内部之间均通过第一轴承转动连接有辅助轮,其中六个所述第二空心块的内部均通过第二轴承转动连接有母卡块,另外六个所述第二空心块的内部均通过第三轴承转动连接有子卡块。本发明通过设置辅助机构,可以让混凝土预制桩快速且稳定地送到沉桩设备的内部,既提高建筑施工的效率,同时也提高了沉桩设备的使用效率。
Pile sinking equipment for concrete precast pile construction and construction method thereof
一种混凝土预制桩施工沉桩设备及其施工方法
HU HAIBIN (author) / WANG JUNHUA (author) / OUYANG YUNMIN (author) / ZHENG WEIFENG (author) / WANG DESHENG (author) / ZHANG DI (author) / CHAI CHENGMING (author)
2024-12-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile sinking construction method for precast concrete plank pile
European Patent Office | 2016
|Pile sinking construction method for drilling and implanting precast pile
European Patent Office | 2023
|