Construction method of long spiral drilling pressure-grouting occlusion cast-in-place pile
The invention relates to the field of pile foundation support construction, and provides a long auger drilling pressure grouting occlusion cast-in-place pile construction method which comprises the steps that S1, a box type guide wall and a reinforcement cage are prefabricated and machined; s2, the erecting positions of plain piles and meat piles are planned and designed on site, and the box type guide wall is anchored to a soil body foundation; s3, a hole A is excavated through a long auger drilling machine, the hole is cleaned, and super-delayed coagulation concrete is injected into the hole A; s4, digging a hole B through a long spiral drilling machine, cleaning the hole, and performing pressure filling on common concrete; s5, the reinforcement cage is hoisted into the corresponding hole B; and S6, the plain piles and the reinforced piles are maintained, and the meshed cast-in-place piles are formed. On the basis, the construction period of the occluded cast-in-place pile can be shortened through rapid supporting of the box type guide wall and concrete pouring of the hole B in a pressure pouring mode, and the good construction progress of constructional engineering can be kept.
本申请涉及桩基支护施工领域,提供了一种长螺旋钻孔压灌咬合灌注桩施工方法,包括步骤S1,预制加工箱式导墙和钢筋笼;步骤S2,现场规划设计素桩与荤桩的支设位置,将箱式导墙锚固于土体基础;步骤S3,通过长螺旋钻孔机开挖A孔,清孔并注入超缓凝混凝土;步骤S4,通过长螺旋钻孔机挖坑B孔,清孔并压灌普通混凝土;步骤S5,将钢筋笼吊入对应的B孔内;步骤S6,对素桩和荤桩进行养护,形成咬合灌注桩。基于此,箱式导墙的快速支设以及B孔以压灌的方式浇筑混凝土,均能够缩短咬合灌注桩的施工周期,使得建筑工程能够保持良好的建造进度。
Construction method of long spiral drilling pressure-grouting occlusion cast-in-place pile
The invention relates to the field of pile foundation support construction, and provides a long auger drilling pressure grouting occlusion cast-in-place pile construction method which comprises the steps that S1, a box type guide wall and a reinforcement cage are prefabricated and machined; s2, the erecting positions of plain piles and meat piles are planned and designed on site, and the box type guide wall is anchored to a soil body foundation; s3, a hole A is excavated through a long auger drilling machine, the hole is cleaned, and super-delayed coagulation concrete is injected into the hole A; s4, digging a hole B through a long spiral drilling machine, cleaning the hole, and performing pressure filling on common concrete; s5, the reinforcement cage is hoisted into the corresponding hole B; and S6, the plain piles and the reinforced piles are maintained, and the meshed cast-in-place piles are formed. On the basis, the construction period of the occluded cast-in-place pile can be shortened through rapid supporting of the box type guide wall and concrete pouring of the hole B in a pressure pouring mode, and the good construction progress of constructional engineering can be kept.
本申请涉及桩基支护施工领域,提供了一种长螺旋钻孔压灌咬合灌注桩施工方法,包括步骤S1,预制加工箱式导墙和钢筋笼;步骤S2,现场规划设计素桩与荤桩的支设位置,将箱式导墙锚固于土体基础;步骤S3,通过长螺旋钻孔机开挖A孔,清孔并注入超缓凝混凝土;步骤S4,通过长螺旋钻孔机挖坑B孔,清孔并压灌普通混凝土;步骤S5,将钢筋笼吊入对应的B孔内;步骤S6,对素桩和荤桩进行养护,形成咬合灌注桩。基于此,箱式导墙的快速支设以及B孔以压灌的方式浇筑混凝土,均能够缩短咬合灌注桩的施工周期,使得建筑工程能够保持良好的建造进度。
Construction method of long spiral drilling pressure-grouting occlusion cast-in-place pile
一种长螺旋钻孔压灌咬合灌注桩施工方法
TU QILONG (author) / ZHANG BENDA (author) / XIAO RONGMEI (author)
2023-02-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Long spiral drilling pressure grouting pile construction pile casing and construction process
European Patent Office | 2020
|Long spiral drilling and pressure grouting pile construction equipment and method
European Patent Office | 2024
|Long spiral drilling machine and cast-in-place pile construction method
European Patent Office | 2021
|Construction method of long spiral drilling and grouting method pile
European Patent Office | 2022
|Intelligent long spiral drilling grouting pile equipment
European Patent Office | 2021
|