A platform for research: civil engineering, architecture and urbanism
Anti-floating anchor rod of foundation raft and construction method of anti-floating anchor rod
The invention discloses an anti-floating anchor rod of a foundation raft and a construction method of the anti-floating anchor rod. The anti-floating anchor rod comprises an anchor rod body and a valve plate. The connecting device has the beneficial effects that the connecting thread sleeve is arranged, the partition plate is arranged in the connecting thread sleeve, the inner threads in opposite directions are arranged on the portions, located on the two sides of the partition plate, of the inner wall of the connecting thread sleeve, and the outer threads in opposite directions are arranged at the ends, close to each other, of the two anchor rod steel bars, so that the anchor rod steel bars are conveniently connected and fixed, and mounting is rapid; the fixation is firmer, and the construction efficiency is improved; the anchoring base plate connected to the upper end of the anchor rod body in a sleeving mode is fixedly arranged on the upper side of the valve plate, the anchoring base plate is made of the steel plate material, the fastening nut is arranged on the upper side of the anchoring base plate, and the connecting thread matched with the fastening nut is arranged on the rod body at the upper end of the anchor rod body, so that the anchor rod can be conveniently fixed by adjusting the fastening nut; the anchoring base plate is connected with the valve plate, and the anchor rod body can be effectively prevented from floating upwards.
本发明公开了一种基础筏板的抗浮锚杆及其施工方法,包括锚杆本体和阀板。本发明的有益效果是:本发明通过设置连接螺套,且在连接螺套的内部设置有隔板,连接螺套内壁位于隔板的两侧设置有走向相反的内螺纹,两个锚杆钢筋相互靠近的一端设置有走向相反的外螺纹,方便将锚杆钢筋进行连接固定,安装快捷,且固定更加牢靠,提高施工效率;通过在阀板的上侧固定设置有套接在锚杆本体上端的锚固垫板,且锚固垫板采用钢板材料制成,锚固垫板的上侧设置有紧固螺母,锚杆本体的上端杆身上设置有与紧固螺母相配合的连接螺纹,方便通过调节紧固螺母,将锚固垫板与阀板进行连接,可以有效避免锚杆本体上浮。
Anti-floating anchor rod of foundation raft and construction method of anti-floating anchor rod
The invention discloses an anti-floating anchor rod of a foundation raft and a construction method of the anti-floating anchor rod. The anti-floating anchor rod comprises an anchor rod body and a valve plate. The connecting device has the beneficial effects that the connecting thread sleeve is arranged, the partition plate is arranged in the connecting thread sleeve, the inner threads in opposite directions are arranged on the portions, located on the two sides of the partition plate, of the inner wall of the connecting thread sleeve, and the outer threads in opposite directions are arranged at the ends, close to each other, of the two anchor rod steel bars, so that the anchor rod steel bars are conveniently connected and fixed, and mounting is rapid; the fixation is firmer, and the construction efficiency is improved; the anchoring base plate connected to the upper end of the anchor rod body in a sleeving mode is fixedly arranged on the upper side of the valve plate, the anchoring base plate is made of the steel plate material, the fastening nut is arranged on the upper side of the anchoring base plate, and the connecting thread matched with the fastening nut is arranged on the rod body at the upper end of the anchor rod body, so that the anchor rod can be conveniently fixed by adjusting the fastening nut; the anchoring base plate is connected with the valve plate, and the anchor rod body can be effectively prevented from floating upwards.
本发明公开了一种基础筏板的抗浮锚杆及其施工方法,包括锚杆本体和阀板。本发明的有益效果是:本发明通过设置连接螺套,且在连接螺套的内部设置有隔板,连接螺套内壁位于隔板的两侧设置有走向相反的内螺纹,两个锚杆钢筋相互靠近的一端设置有走向相反的外螺纹,方便将锚杆钢筋进行连接固定,安装快捷,且固定更加牢靠,提高施工效率;通过在阀板的上侧固定设置有套接在锚杆本体上端的锚固垫板,且锚固垫板采用钢板材料制成,锚固垫板的上侧设置有紧固螺母,锚杆本体的上端杆身上设置有与紧固螺母相配合的连接螺纹,方便通过调节紧固螺母,将锚固垫板与阀板进行连接,可以有效避免锚杆本体上浮。
Anti-floating anchor rod of foundation raft and construction method of anti-floating anchor rod
一种基础筏板的抗浮锚杆及其施工方法
JIAO KE (author) / WANG BINGBING (author) / PAN JIANGWEI (author)
2023-02-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
|