A platform for research: civil engineering, architecture and urbanism
Nuclear island reactor building construction equipment integration platform and climbing method thereof
The invention discloses a nuclear island reactor building construction equipment integration platform and a climbing method thereof. The nuclear island reactor building construction equipment integration platform comprises a steel platform system, a supporting and jacking system, a hanging frame and formwork system and construction integration equipment, the supporting and jacking system is installed on the side face of a nuclear island reactor building and located below the steel platform system, and the hanging frame and formwork system is installed below the steel platform system; the steel platform system comprises an annular steel truss, a radial main steel truss and a radial secondary steel truss; and the construction integrated equipment comprises an annular rail mounted at the bottom of the hanging frame and template system and an annular crane connected with the annular rail in a sliding manner. The nuclear island reactor building construction equipment integration platform solves the problem that in existing construction of a nuclear island reactor building, a stepped process of an inner shell, an outer shell and a peripheral building restricts the total construction period.
本发明公开了一种核岛反应堆厂房施工装备集成平台及其爬升方法。本核岛反应堆厂房施工装备集成平台包括钢平台系统、支承及顶升系统、挂架及模板系统和施工集成装备,支承及顶升系统安装于核岛反应堆厂房的侧面上,支承及顶升系统位于钢平台系统的下方,挂架及模板系统安装于钢平台系统下方;钢平台系统包括环向钢桁架、径向主钢桁架以及径向次钢桁架,施工集成装备包括安装于挂架及模板系统底部的环形轨道以及与环形轨道滑动连接的环吊。本核岛反应堆厂房施工装备集成平台,解决了核岛反应堆厂房现有施工中内壳、外壳、周边厂房“阶梯式”工艺制约总工期的问题。
Nuclear island reactor building construction equipment integration platform and climbing method thereof
The invention discloses a nuclear island reactor building construction equipment integration platform and a climbing method thereof. The nuclear island reactor building construction equipment integration platform comprises a steel platform system, a supporting and jacking system, a hanging frame and formwork system and construction integration equipment, the supporting and jacking system is installed on the side face of a nuclear island reactor building and located below the steel platform system, and the hanging frame and formwork system is installed below the steel platform system; the steel platform system comprises an annular steel truss, a radial main steel truss and a radial secondary steel truss; and the construction integrated equipment comprises an annular rail mounted at the bottom of the hanging frame and template system and an annular crane connected with the annular rail in a sliding manner. The nuclear island reactor building construction equipment integration platform solves the problem that in existing construction of a nuclear island reactor building, a stepped process of an inner shell, an outer shell and a peripheral building restricts the total construction period.
本发明公开了一种核岛反应堆厂房施工装备集成平台及其爬升方法。本核岛反应堆厂房施工装备集成平台包括钢平台系统、支承及顶升系统、挂架及模板系统和施工集成装备,支承及顶升系统安装于核岛反应堆厂房的侧面上,支承及顶升系统位于钢平台系统的下方,挂架及模板系统安装于钢平台系统下方;钢平台系统包括环向钢桁架、径向主钢桁架以及径向次钢桁架,施工集成装备包括安装于挂架及模板系统底部的环形轨道以及与环形轨道滑动连接的环吊。本核岛反应堆厂房施工装备集成平台,解决了核岛反应堆厂房现有施工中内壳、外壳、周边厂房“阶梯式”工艺制约总工期的问题。
Nuclear island reactor building construction equipment integration platform and climbing method thereof
核岛反应堆厂房施工装备集成平台及其爬升方法
ZHANG KUN (author) / WANG KAIQIANG (author) / WANG DONG (author) / SUN QING (author) / ZHAO WEI (author) / LIU WEI (author) / CHEN LIHUA (author) / HUANG LEI (author) / LIU YONGBO (author) / YAO TAO (author)
2023-02-03
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2024
|European Patent Office | 2023
|Climbing type building construction operation platform outside building
European Patent Office | 2021
|