The invention relates to the technical field of road surface construction, and particularly discloses a road surface construction method which comprises the following specific steps: S1, cement stabilized macadam base construction: paving a lower layer by a paver, rolling by a double-wheel road roller and a vibratory roller, paving an upper layer by a paver, and rolling by a double-wheel road roller and a vibratory roller; rolling by using a double-wheel road roller and a vibratory road roller after the smooth-wheel road roller stabilizes the pressure; s2, geotextile laying and regular water spraying maintenance are conducted, specifically, the geotextile is laid on the road surface through a geotextile laying device, watering is conducted through a watering cart after the geotextile covers the road surface for two hours, and a spraying type is adopted for a spraying head of the watering cart so that a base layer structure can be prevented from being damaged; s3, asphalt concrete surface layer construction: transporting the mixed asphalt mixture to a construction site for asphalt paving work; the geotechnical cloth is laid through the geotechnical cloth laying device, so that the trouble of manually laying the geotechnical cloth is reduced, and the labor intensity of workers is reduced.
本发明涉及路面施工技术领域,具体公开了一种路面施工方法,该施工方法包括如下具体步骤:S1:水泥稳定碎石基层施工:下层通过摊铺机摊铺,双轮压路机和振动压路机碾压,上层采用摊铺机摊铺,光轮压路机稳压后用双轮压路机和振动压路机碾压;S2:土工布的铺设和定期喷水养生:通过土工布铺设装置将土工布铺设在路面上,在土工布覆盖两个小时后用洒水车洒水,洒水车的喷头采用喷雾式,以免破坏基层结构;S3:沥青混凝土面层施工:将拌合好的沥青混合料运输至施工现场进行沥青的摊铺工作;通过土工布铺设装置进行土工布的铺设减少人工铺设土工布的麻烦,降低人工劳动强度。
The invention relates to the technical field of road surface construction, and particularly discloses a road surface construction method which comprises the following specific steps: S1, cement stabilized macadam base construction: paving a lower layer by a paver, rolling by a double-wheel road roller and a vibratory roller, paving an upper layer by a paver, and rolling by a double-wheel road roller and a vibratory roller; rolling by using a double-wheel road roller and a vibratory road roller after the smooth-wheel road roller stabilizes the pressure; s2, geotextile laying and regular water spraying maintenance are conducted, specifically, the geotextile is laid on the road surface through a geotextile laying device, watering is conducted through a watering cart after the geotextile covers the road surface for two hours, and a spraying type is adopted for a spraying head of the watering cart so that a base layer structure can be prevented from being damaged; s3, asphalt concrete surface layer construction: transporting the mixed asphalt mixture to a construction site for asphalt paving work; the geotechnical cloth is laid through the geotechnical cloth laying device, so that the trouble of manually laying the geotechnical cloth is reduced, and the labor intensity of workers is reduced.
本发明涉及路面施工技术领域,具体公开了一种路面施工方法,该施工方法包括如下具体步骤:S1:水泥稳定碎石基层施工:下层通过摊铺机摊铺,双轮压路机和振动压路机碾压,上层采用摊铺机摊铺,光轮压路机稳压后用双轮压路机和振动压路机碾压;S2:土工布的铺设和定期喷水养生:通过土工布铺设装置将土工布铺设在路面上,在土工布覆盖两个小时后用洒水车洒水,洒水车的喷头采用喷雾式,以免破坏基层结构;S3:沥青混凝土面层施工:将拌合好的沥青混合料运输至施工现场进行沥青的摊铺工作;通过土工布铺设装置进行土工布的铺设减少人工铺设土工布的麻烦,降低人工劳动强度。
Pavement construction method
一种路面施工方法
2023-02-28
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
PAVEMENT MATERIAL, PAVEMENT BODY, AND PAVEMENT BODY CONSTRUCTION METHOD
European Patent Office | 2021
|