The invention discloses an engineering construction pile foundation settlement monitoring system, and relates to the technical field of construction settlement monitoring. The device comprises a fixing frame used for being fixed to a bearing platform; the piston block is movably arranged in the oil cylinder and blocks the oil cylinder; and the pressure gauge is communicated with the closed accommodating cavity through a pipeline assembly. Through cooperation between the oil cylinder and the piston block, when the pile cap sinks, the piston block is pressed, so that hydraulic oil in the closed containing cavity bears pressure, the pressure is transmitted to the pressure gauge through the pipeline assembly, and the pressure can be in direct proportion change along with the change of the settlement amplitude; therefore, the microcosmic movement distance of the whole pile foundation can be accurately and perfectly displayed through the reading change of the pressure gauge so as to display the settlement condition of the whole pile foundation, and compared with some existing monitoring methods or equipment, the system has the advantages of being simple in structure and high in detection precision and is convenient and flexible to use.
本申请公开了一种工程建设桩基沉降监测系统,涉及施工沉降监测技术领域。本申请包括:用于与承台相固定的固定架;油缸以及活动设置在所述油缸内并对油缸形成封堵的活塞块;通过管道组件与所述密闭容腔连通的压力计。本申请通过油缸与活塞块之间的配合,当桩承台下沉时,对活塞块进行压持,从而使密闭容腔内的液压油受到压力,并通过管道组件将压力传给压力计,且压力大小会随着沉降幅度的变化而成正比变化,从而通过压力计的示数变化可以精准将整个桩基的微观移动距离完好的展示出来,以显示整个桩基的沉降状况,相比于现有的一些监测方法或设备来说,本系统具有结构简单以及检测精度高的特点,使用较为方便灵活。
Engineering construction pile foundation settlement monitoring system
The invention discloses an engineering construction pile foundation settlement monitoring system, and relates to the technical field of construction settlement monitoring. The device comprises a fixing frame used for being fixed to a bearing platform; the piston block is movably arranged in the oil cylinder and blocks the oil cylinder; and the pressure gauge is communicated with the closed accommodating cavity through a pipeline assembly. Through cooperation between the oil cylinder and the piston block, when the pile cap sinks, the piston block is pressed, so that hydraulic oil in the closed containing cavity bears pressure, the pressure is transmitted to the pressure gauge through the pipeline assembly, and the pressure can be in direct proportion change along with the change of the settlement amplitude; therefore, the microcosmic movement distance of the whole pile foundation can be accurately and perfectly displayed through the reading change of the pressure gauge so as to display the settlement condition of the whole pile foundation, and compared with some existing monitoring methods or equipment, the system has the advantages of being simple in structure and high in detection precision and is convenient and flexible to use.
本申请公开了一种工程建设桩基沉降监测系统,涉及施工沉降监测技术领域。本申请包括:用于与承台相固定的固定架;油缸以及活动设置在所述油缸内并对油缸形成封堵的活塞块;通过管道组件与所述密闭容腔连通的压力计。本申请通过油缸与活塞块之间的配合,当桩承台下沉时,对活塞块进行压持,从而使密闭容腔内的液压油受到压力,并通过管道组件将压力传给压力计,且压力大小会随着沉降幅度的变化而成正比变化,从而通过压力计的示数变化可以精准将整个桩基的微观移动距离完好的展示出来,以显示整个桩基的沉降状况,相比于现有的一些监测方法或设备来说,本系统具有结构简单以及检测精度高的特点,使用较为方便灵活。
Engineering construction pile foundation settlement monitoring system
一种工程建设桩基沉降监测系统
SHIM EUI-SUN (author) / BIAN HAIXIA (author) / KUANG LI (author)
2023-02-28
Patent
Electronic Resource
Chinese
Construction engineering foundation settlement monitoring method
European Patent Office | 2020
|Pile foundation settlement monitoring method and early warning system in construction process
European Patent Office | 2024
|Sludge layer pile foundation settlement monitoring device