A platform for research: civil engineering, architecture and urbanism
Concrete wall column screw hole plugging construction method
The invention discloses a concrete wall column screw hole blocking construction method which comprises the following steps that firstly, an expansion rubber plug is arranged at the outer end of a screw hole, and an expansion bolt is inserted into the expansion rubber plug; then, a nut rotating manipulator capable of ascending and descending is arranged on the AGV trolley, the front end of the nut rotating manipulator is inserted from the inner end of the screw hole, and a nut of the expansion bolt is rotated to enable the expansion rubber plug to expand to plug the outer end of the screw hole; and finally, a guniting manipulator capable of ascending and descending is arranged on the AGV trolley, and the front end of the guniting manipulator is inserted into the screw hole and carries out grouting plugging work. The concrete wall column screw hole plugging construction method belongs to the technical field of building construction, an AGV trolley can operate a driving rod and a mechanical front arm to work respectively to plug a screw hole in a concrete wall, the utilization rate of automation equipment is increased, the labor intensity of workers is reduced, and the construction efficiency is improved.
本发明公开了一种混凝土墙柱螺杆洞封堵施工方法,包括以下步骤:首先,在螺杆洞的外端设置膨胀橡胶堵头,所述膨胀橡胶堵头内插设有膨胀螺栓;然后,在AGV小车上设置能够升降的旋转螺帽机械手,旋转螺帽机械手的前端从螺杆洞的内端插入,并旋转膨胀螺栓的螺母使膨胀橡胶堵头胀开将螺杆洞的外端封堵;最后,在AGV小车上设置能够升降的喷浆机械手,所述喷浆机械手的前端插入螺杆洞内并进行注浆封堵工作。本发明的混凝土墙柱螺杆洞封堵施工方法,属于建筑施工技术领域,AGV小车可以操作驱动杆、机械前臂分别工作,将混凝土墙上的螺杆洞进行封堵,提高了自动化设备的使用率,降低了工人的劳动强度,提高了施工效率。
Concrete wall column screw hole plugging construction method
The invention discloses a concrete wall column screw hole blocking construction method which comprises the following steps that firstly, an expansion rubber plug is arranged at the outer end of a screw hole, and an expansion bolt is inserted into the expansion rubber plug; then, a nut rotating manipulator capable of ascending and descending is arranged on the AGV trolley, the front end of the nut rotating manipulator is inserted from the inner end of the screw hole, and a nut of the expansion bolt is rotated to enable the expansion rubber plug to expand to plug the outer end of the screw hole; and finally, a guniting manipulator capable of ascending and descending is arranged on the AGV trolley, and the front end of the guniting manipulator is inserted into the screw hole and carries out grouting plugging work. The concrete wall column screw hole plugging construction method belongs to the technical field of building construction, an AGV trolley can operate a driving rod and a mechanical front arm to work respectively to plug a screw hole in a concrete wall, the utilization rate of automation equipment is increased, the labor intensity of workers is reduced, and the construction efficiency is improved.
本发明公开了一种混凝土墙柱螺杆洞封堵施工方法,包括以下步骤:首先,在螺杆洞的外端设置膨胀橡胶堵头,所述膨胀橡胶堵头内插设有膨胀螺栓;然后,在AGV小车上设置能够升降的旋转螺帽机械手,旋转螺帽机械手的前端从螺杆洞的内端插入,并旋转膨胀螺栓的螺母使膨胀橡胶堵头胀开将螺杆洞的外端封堵;最后,在AGV小车上设置能够升降的喷浆机械手,所述喷浆机械手的前端插入螺杆洞内并进行注浆封堵工作。本发明的混凝土墙柱螺杆洞封堵施工方法,属于建筑施工技术领域,AGV小车可以操作驱动杆、机械前臂分别工作,将混凝土墙上的螺杆洞进行封堵,提高了自动化设备的使用率,降低了工人的劳动强度,提高了施工效率。
Concrete wall column screw hole plugging construction method
一种混凝土墙柱螺杆洞封堵施工方法
JIANG XIN (author) / TANG JING (author) / FENG JIANJUN (author) / YANG ZHIYONG (author) / HUANG HAIHUA (author) / ZHANG SHIZHAO (author) / LIN HONGYAO (author) / YAO ENGUO (author)
2023-03-03
Patent
Electronic Resource
Chinese
European Patent Office | 2020
|Squeezing plugging construction method and screw hole plugging device
European Patent Office | 2022
|Outer wall screw rod hole plugging device and construction method
European Patent Office | 2021
|