A platform for research: civil engineering, architecture and urbanism
Steel wire rope ladder and processing and manufacturing method of steel wire rope ladder
The invention provides a steel wire rope ladder and a machining and manufacturing method of the steel wire rope ladder, the steel wire rope ladder comprises a plurality of rope ladder bodies, a plurality of first connecting pieces are arranged between every two adjacent rope ladder bodies, and every two adjacent rope ladder bodies are detachably connected through the multiple first connecting pieces; each rope ladder body comprises two steel wire ropes and a plurality of step ladder cross rods, the two steel wire ropes are arranged in parallel, the step ladder cross rods are arranged at intervals in the length direction of the steel wire ropes, the two ends of the step ladder cross rods are fixedly arranged on the two steel wire ropes respectively, and the extending direction of the step ladder cross rods is perpendicular to the length direction of the steel wire ropes. By means of the technical scheme, the problem that in the prior art, a ladder hung at a coal mine emergency exit channel cannot adapt to the change of the angle of a field channel can be solved.
本发明提供了一种钢丝绳软梯及钢丝绳软梯的加工制作方法,钢丝绳软梯包括多个软梯本体,相邻两个软梯本体之间设置有多个第一连接件,相邻两个软梯本体通过多个第一连接件可拆卸连接,每个软梯本体包括两个钢丝绳和多个踏梯横杆,两个钢丝绳平行设置,多个踏梯横杆沿钢丝绳的长度方向间隔设置,踏梯横杆的两端分别固定设置在两个钢丝绳上,踏梯横杆的延伸方向与钢丝绳的长度方向相垂直。通过本申请提供的技术方案,能够解决现有技术中的煤矿安全出口通道处悬挂的梯子无法适应现场通道角度的变化的问题。
Steel wire rope ladder and processing and manufacturing method of steel wire rope ladder
The invention provides a steel wire rope ladder and a machining and manufacturing method of the steel wire rope ladder, the steel wire rope ladder comprises a plurality of rope ladder bodies, a plurality of first connecting pieces are arranged between every two adjacent rope ladder bodies, and every two adjacent rope ladder bodies are detachably connected through the multiple first connecting pieces; each rope ladder body comprises two steel wire ropes and a plurality of step ladder cross rods, the two steel wire ropes are arranged in parallel, the step ladder cross rods are arranged at intervals in the length direction of the steel wire ropes, the two ends of the step ladder cross rods are fixedly arranged on the two steel wire ropes respectively, and the extending direction of the step ladder cross rods is perpendicular to the length direction of the steel wire ropes. By means of the technical scheme, the problem that in the prior art, a ladder hung at a coal mine emergency exit channel cannot adapt to the change of the angle of a field channel can be solved.
本发明提供了一种钢丝绳软梯及钢丝绳软梯的加工制作方法,钢丝绳软梯包括多个软梯本体,相邻两个软梯本体之间设置有多个第一连接件,相邻两个软梯本体通过多个第一连接件可拆卸连接,每个软梯本体包括两个钢丝绳和多个踏梯横杆,两个钢丝绳平行设置,多个踏梯横杆沿钢丝绳的长度方向间隔设置,踏梯横杆的两端分别固定设置在两个钢丝绳上,踏梯横杆的延伸方向与钢丝绳的长度方向相垂直。通过本申请提供的技术方案,能够解决现有技术中的煤矿安全出口通道处悬挂的梯子无法适应现场通道角度的变化的问题。
Steel wire rope ladder and processing and manufacturing method of steel wire rope ladder
钢丝绳软梯及钢丝绳软梯的加工制作方法
WANG HONGMIN (author) / HE JIANJIANG (author) / WU ZHIQIANG (author) / YANG SHUYOU (author) / GUO XINHAI (author) / LI QIANG (author) / XIANG WEI (author) / CHENG BAOYUAN (author) / ZHOU SENLIN (author) / SHI YONGJUN (author)
2023-03-03
Patent
Electronic Resource
Chinese
Preparation method of flexible rope ladder and flexible rope ladder
European Patent Office | 2021
|