A platform for research: civil engineering, architecture and urbanism
Construction method of pile-pier-beam integrated bridge fabrication machine
The invention relates to a construction method of a pile-pier-beam integrated bridge fabrication machine. The pile-pier-beam integrated bridge fabrication machine comprises a main beam, a front supporting leg, a rear supporting leg, a site leveling module, a pile foundation construction module, a front auxiliary supporting leg, a rear auxiliary supporting leg and a crown block hoisting system, wherein the front supporting leg, the rear supporting leg, the site leveling module, the pile foundation construction module, the front auxiliary supporting leg and the rear auxiliary supporting leg can move along the main beam in two directions and are connected to the lower portion of the main beam; the bridge construction integrated operation process is achieved, the whole bridge construction process from site leveling, pile foundation construction, bearing platform construction, pier body bent cap construction to beam and slab erection is completed, the supporting legs are provided with self-anchoring devices, and a supporting foundation of the equipment supporting legs does not need to be built; the system can adapt to environment protection areas where shortcuts cannot be built, mountain and forest areas with dangerous terrain, bridge construction with small curve radius, urban overpass construction with small floor space requirement and the like, is wide in adaptive working condition, high in construction efficiency, high in equipment integration degree, capable of reducing equipment investment, good in economical efficiency, and capable of reducing influence on the environment through a sewage and waste residue garbage treatment module. And green construction is realized.
本发明涉及一种桩墩梁一体化造桥机施工方法,包括:主梁、可沿所述主梁双向移动连接在所述主梁下部的前支腿、后支腿、场地平整模块、桩基施工模块、前辅助支腿、后辅助支腿以及双向移动连接在所述主梁上部的天车吊装系统。本发明实现桥梁施工一体化作业流程,完成从场地平整、桩基施工、承台施工、墩身盖梁施工到梁板架设全部桥梁施工工艺,支腿具备自锚固装置,无需修建设备支腿的支撑基础,可适应无法修建便道环境保护区、地势险要山林地区、曲线半径小的桥梁施工以及占地要求小的城市立交桥施工等,适应工况广,施工效率高,设备集成度高,可降低设备投入,经济性好,污水和废渣等垃圾处理模块,能够减少对环境的影响,实现绿色建造。
Construction method of pile-pier-beam integrated bridge fabrication machine
The invention relates to a construction method of a pile-pier-beam integrated bridge fabrication machine. The pile-pier-beam integrated bridge fabrication machine comprises a main beam, a front supporting leg, a rear supporting leg, a site leveling module, a pile foundation construction module, a front auxiliary supporting leg, a rear auxiliary supporting leg and a crown block hoisting system, wherein the front supporting leg, the rear supporting leg, the site leveling module, the pile foundation construction module, the front auxiliary supporting leg and the rear auxiliary supporting leg can move along the main beam in two directions and are connected to the lower portion of the main beam; the bridge construction integrated operation process is achieved, the whole bridge construction process from site leveling, pile foundation construction, bearing platform construction, pier body bent cap construction to beam and slab erection is completed, the supporting legs are provided with self-anchoring devices, and a supporting foundation of the equipment supporting legs does not need to be built; the system can adapt to environment protection areas where shortcuts cannot be built, mountain and forest areas with dangerous terrain, bridge construction with small curve radius, urban overpass construction with small floor space requirement and the like, is wide in adaptive working condition, high in construction efficiency, high in equipment integration degree, capable of reducing equipment investment, good in economical efficiency, and capable of reducing influence on the environment through a sewage and waste residue garbage treatment module. And green construction is realized.
本发明涉及一种桩墩梁一体化造桥机施工方法,包括:主梁、可沿所述主梁双向移动连接在所述主梁下部的前支腿、后支腿、场地平整模块、桩基施工模块、前辅助支腿、后辅助支腿以及双向移动连接在所述主梁上部的天车吊装系统。本发明实现桥梁施工一体化作业流程,完成从场地平整、桩基施工、承台施工、墩身盖梁施工到梁板架设全部桥梁施工工艺,支腿具备自锚固装置,无需修建设备支腿的支撑基础,可适应无法修建便道环境保护区、地势险要山林地区、曲线半径小的桥梁施工以及占地要求小的城市立交桥施工等,适应工况广,施工效率高,设备集成度高,可降低设备投入,经济性好,污水和废渣等垃圾处理模块,能够减少对环境的影响,实现绿色建造。
Construction method of pile-pier-beam integrated bridge fabrication machine
一种桩墩梁一体化造桥机施工方法
ZHANG HAITAO (author) / CAO ZHENBIAO (author) / CAO CHENGJIE (author) / DONG GANGPU (author) / LIANG ZHICHAO (author) / ZHANG LIJIAN (author)
2023-03-07
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Bridge erecting machine for pier-beam integrated construction
European Patent Office | 2021
|Erecting method of pier-beam integrated construction bridge girder erection machine
European Patent Office | 2022
|Device for pile-pier integrated construction and construction method
European Patent Office | 2023
|