A platform for research: civil engineering, architecture and urbanism
Device for pile-pier integrated construction and construction method
The invention relates to the field of pile and pier construction, in particular to a device for pile and pier integrated construction and a construction method.The construction method comprises the following steps that S100, a concrete pipe pile is preset, a connecting frame is prefabricated, and the connecting frame is formed by welding a plurality of first connecting steel plates and a plurality of supporting steel bars; s200, a second connecting steel plate is welded to the outer wall of the concrete pipe pile; and S300, the concrete pipe piles are vertically inserted into the ground, the first connecting steel plates and the second connecting steel plates are welded, the connecting frames are fixed to the outer side walls of the concrete pipe piles, and the adjacent concrete pipe piles are connected through the connecting frames. The method has the effects of reducing use of reinforcing steel bars during abutment pouring, shortening the construction time and improving the construction efficiency.
本发明涉及桩墩施工的领域,尤其是涉及一种桩墩一体化施工用装置及施工方法,施工方法包括如下步骤,S100,预置混凝土管桩,预制连接架,所述连接架由多块第一连接钢板和多根支撑钢筋焊接而成;S200,在所述混凝土管桩的外壁上焊接第二连接钢板;S300,将所述混凝土管桩竖直插入地面,将所述第一连接钢板和所述第二连接钢板进行焊接,将所述连接架固定在所述混凝土管桩的外侧壁上,所述连接架将相邻的所述混凝土管桩连接。本发明具有减少墩台浇筑时钢筋的使用,缩短施工时间,提升施工效率的效果。
Device for pile-pier integrated construction and construction method
The invention relates to the field of pile and pier construction, in particular to a device for pile and pier integrated construction and a construction method.The construction method comprises the following steps that S100, a concrete pipe pile is preset, a connecting frame is prefabricated, and the connecting frame is formed by welding a plurality of first connecting steel plates and a plurality of supporting steel bars; s200, a second connecting steel plate is welded to the outer wall of the concrete pipe pile; and S300, the concrete pipe piles are vertically inserted into the ground, the first connecting steel plates and the second connecting steel plates are welded, the connecting frames are fixed to the outer side walls of the concrete pipe piles, and the adjacent concrete pipe piles are connected through the connecting frames. The method has the effects of reducing use of reinforcing steel bars during abutment pouring, shortening the construction time and improving the construction efficiency.
本发明涉及桩墩施工的领域,尤其是涉及一种桩墩一体化施工用装置及施工方法,施工方法包括如下步骤,S100,预置混凝土管桩,预制连接架,所述连接架由多块第一连接钢板和多根支撑钢筋焊接而成;S200,在所述混凝土管桩的外壁上焊接第二连接钢板;S300,将所述混凝土管桩竖直插入地面,将所述第一连接钢板和所述第二连接钢板进行焊接,将所述连接架固定在所述混凝土管桩的外侧壁上,所述连接架将相邻的所述混凝土管桩连接。本发明具有减少墩台浇筑时钢筋的使用,缩短施工时间,提升施工效率的效果。
Device for pile-pier integrated construction and construction method
一种桩墩一体化施工用装置及施工方法
LIN DONGWEI (author) / ZHANG LUOCHUAN (author) / ZHANG XIAOMING (author) / DENG YUANXIN (author) / WANG SHAO (author) / CHEN JIALI (author) / ZHANG WENJIE (author) / ZHU HAIJIANG (author) / ZHANG LIWEN (author) / ZHANG ZIHUI (author)
2023-08-29
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Pile foundation construction method and pier construction method
European Patent Office | 2021
|Construction method of pile-pier-beam integrated bridge fabrication machine
European Patent Office | 2023
|Anti-scouring pier pile foundation structure, construction device and construction method
European Patent Office | 2023
|