A platform for research: civil engineering, architecture and urbanism
Pillar and abutment cast-in-place box girder construction device and construction process
The invention discloses a pier and abutment cast-in-place box girder construction device and technology, and belongs to the field of bridge construction.The pier and abutment cast-in-place box girder construction device comprises an upper template and a lower template, an upper folding template is hinged to the upper template, a torsion spring is arranged at the hinged position of the upper folding template and the upper template, a lower folding template is hinged to the lower template, and the torsion spring is arranged at the hinged position of the upper folding template and the lower folding template. A torsion spring is arranged at the hinged position of the lower folding template and the lower template, a side template is arranged on the lower template in a sliding mode, a folding assembly used for driving the side template to move is arranged on the lower template, a first fixing assembly used for fixing the upper folding template is arranged on the upper template, and a second fixing assembly used for fixing the lower folding template is arranged on the lower template. And a second fixing assembly for fixing the lower folding template is arranged on the lower template. The box girder upper core mold has the effect that an operator can conveniently and rapidly dismantle the mold plate of the box girder upper core mold.
本申请公开了墩台现浇箱梁施工装置及施工工艺,属于桥梁施工领域,其墩台现浇箱梁施工装置,包括上模板以及下模板,所述上模板上铰接有上折叠模板,所述上折叠模板与所述上模板铰接处设置有扭簧,所述下模板上铰接有下折叠模板,所述下折叠模板与所述下模板铰接处也设置有扭簧,所述下模板上滑动设置有侧边模板,所述下模板上用于驱动所述侧边模板移动的折叠组件,所述所述上模板上设置有用于固定所述上折叠模板的第一固定组件,所述下模板上设置有用于固定所述下折叠模板的第二固定组件。本申请具有方便操作人员对箱梁上芯模的模板进行快速拆除的效果。
Pillar and abutment cast-in-place box girder construction device and construction process
The invention discloses a pier and abutment cast-in-place box girder construction device and technology, and belongs to the field of bridge construction.The pier and abutment cast-in-place box girder construction device comprises an upper template and a lower template, an upper folding template is hinged to the upper template, a torsion spring is arranged at the hinged position of the upper folding template and the upper template, a lower folding template is hinged to the lower template, and the torsion spring is arranged at the hinged position of the upper folding template and the lower folding template. A torsion spring is arranged at the hinged position of the lower folding template and the lower template, a side template is arranged on the lower template in a sliding mode, a folding assembly used for driving the side template to move is arranged on the lower template, a first fixing assembly used for fixing the upper folding template is arranged on the upper template, and a second fixing assembly used for fixing the lower folding template is arranged on the lower template. And a second fixing assembly for fixing the lower folding template is arranged on the lower template. The box girder upper core mold has the effect that an operator can conveniently and rapidly dismantle the mold plate of the box girder upper core mold.
本申请公开了墩台现浇箱梁施工装置及施工工艺,属于桥梁施工领域,其墩台现浇箱梁施工装置,包括上模板以及下模板,所述上模板上铰接有上折叠模板,所述上折叠模板与所述上模板铰接处设置有扭簧,所述下模板上铰接有下折叠模板,所述下折叠模板与所述下模板铰接处也设置有扭簧,所述下模板上滑动设置有侧边模板,所述下模板上用于驱动所述侧边模板移动的折叠组件,所述所述上模板上设置有用于固定所述上折叠模板的第一固定组件,所述下模板上设置有用于固定所述下折叠模板的第二固定组件。本申请具有方便操作人员对箱梁上芯模的模板进行快速拆除的效果。
Pillar and abutment cast-in-place box girder construction device and construction process
墩台现浇箱梁施工装置及施工工艺
FU XIAONENG (author) / SHE KAI (author) / TAN DONGYA (author) / ZHANG RENYI (author) / CHEN QIANGWEI (author) / WU DAYONG (author) / WANG QI (author) / MA MENGMENG (author) / YANG HENGJIE (author)
2023-03-07
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken