Underground transportation junction structure and construction method
The invention provides an underground transportation hub structure and a construction method, and belongs to the field of underground construction engineering.The underground transportation hub structure comprises a vertical bearing assembly, a first anti-floating pile assembly, a second anti-floating pile assembly, a horizontal bearing assembly and a plate body structure, and the vertical bearing assembly is arranged in a first foundation pit; the first anti-floating pile assembly is arranged in a second foundation pit which is parallel to the first foundation pit and is arranged on one side of the first foundation pit; the second anti-floating pile assembly is arranged in a third foundation pit which is arranged in parallel with the first foundation pit and is arranged on the other side of the first foundation pit; the horizontal bearing assembly is arranged at the boundary position of the first foundation pit and the second foundation pit. The plate body structure is arranged in the first foundation pit, the second foundation pit and the third foundation pit and connected with the vertical bearing assembly, the first anti-floating pile assembly, the second anti-floating pile assembly and the horizontal bearing assembly. According to the underground transportation junction structure and the construction method, it can be ensured that urban roads in a transportation junction area can be completed as soon as possible, the urban roads are communicated with surrounding roads to form a traffic network, and the influence of underground junction construction on urban traffic is reduced to the maximum extent.
本发明提供了一种地下交通枢纽结构及施工方法,属于地下建筑工程领域,包括竖向承载组件、第一抗浮桩组件、第二抗浮桩组件、水平向承载组件以及板体结构,竖向承载组件设置于第一基坑内;第一抗浮桩组件设置于与第一基坑并列设置,且设置于第一基坑的一侧的第二基坑内;第二抗浮桩组件设置于与第一基坑并列设置,设置于第一基坑的另一侧的第三基坑内;水平向承载组件设置于第一基坑与第二基坑的分界位置;板体结构设置于第一基坑、第二基坑、第三基坑内,且与竖向承载组件、第一抗浮桩组件、第二抗浮桩组件以及水平向承载组件连接。本发明提供的一种地下交通枢纽结构及施工方法,能确保交通枢纽区域内的城市道路尽快完成,并与周围道路贯通形成交通网络,最大限度降低地下枢纽施工对城市交通的影响。
Underground transportation junction structure and construction method
The invention provides an underground transportation hub structure and a construction method, and belongs to the field of underground construction engineering.The underground transportation hub structure comprises a vertical bearing assembly, a first anti-floating pile assembly, a second anti-floating pile assembly, a horizontal bearing assembly and a plate body structure, and the vertical bearing assembly is arranged in a first foundation pit; the first anti-floating pile assembly is arranged in a second foundation pit which is parallel to the first foundation pit and is arranged on one side of the first foundation pit; the second anti-floating pile assembly is arranged in a third foundation pit which is arranged in parallel with the first foundation pit and is arranged on the other side of the first foundation pit; the horizontal bearing assembly is arranged at the boundary position of the first foundation pit and the second foundation pit. The plate body structure is arranged in the first foundation pit, the second foundation pit and the third foundation pit and connected with the vertical bearing assembly, the first anti-floating pile assembly, the second anti-floating pile assembly and the horizontal bearing assembly. According to the underground transportation junction structure and the construction method, it can be ensured that urban roads in a transportation junction area can be completed as soon as possible, the urban roads are communicated with surrounding roads to form a traffic network, and the influence of underground junction construction on urban traffic is reduced to the maximum extent.
本发明提供了一种地下交通枢纽结构及施工方法,属于地下建筑工程领域,包括竖向承载组件、第一抗浮桩组件、第二抗浮桩组件、水平向承载组件以及板体结构,竖向承载组件设置于第一基坑内;第一抗浮桩组件设置于与第一基坑并列设置,且设置于第一基坑的一侧的第二基坑内;第二抗浮桩组件设置于与第一基坑并列设置,设置于第一基坑的另一侧的第三基坑内;水平向承载组件设置于第一基坑与第二基坑的分界位置;板体结构设置于第一基坑、第二基坑、第三基坑内,且与竖向承载组件、第一抗浮桩组件、第二抗浮桩组件以及水平向承载组件连接。本发明提供的一种地下交通枢纽结构及施工方法,能确保交通枢纽区域内的城市道路尽快完成,并与周围道路贯通形成交通网络,最大限度降低地下枢纽施工对城市交通的影响。
Underground transportation junction structure and construction method
一种地下交通枢纽结构及施工方法
KONG HENG (author) / WANG WENZHENG (author) / GUO FEI (author) / WANG FUQIANG (author) / SHI YONGJIE (author) / JIANG WEI (author) / HAN XUEGANG (author) / TIAN ZHIZHOU (author) / FU RUIZHI (author) / GAO SHENGLEI (author)
2023-03-07
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Reverse construction method for staged construction of underground garage junction
European Patent Office | 2023
|Construction method for platform steel structure main body of transportation junction
European Patent Office | 2022
|Comprehensive transportation junction buttress construction equipment and method
European Patent Office | 2024
|European Patent Office | 2023
|