A platform for research: civil engineering, architecture and urbanism
The invention discloses a wall building device and a building method thereof. The wall building device comprises two vertical plates, a displacement adjusting mechanism, a separation mortar conveying mechanism and an automatic control mechanism. The two vertical plates are symmetrically arranged, transverse plates are fixedly connected to the opposite faces of the two vertical plates, supporting plates are arranged on the opposite sides of the two transverse plates, and universal wheels are installed at the bottoms of the vertical plates; the separation slurry conveying mechanism is mounted at the bottom of the supporting plate; during use, the air cylinder is started to adjust the positions of the movable plate and the partition plate in the vertical direction, the bottom of the partition plate is attached to the bricklaying position of the top of a wall, bricks are placed along the partition plate, masonry mortar is conveyed through the mortar conveying pipe, and the mortar enters the three-way pipe in the partition plate after passing through the mortar conveying pipe; and during conveying, the air cylinders are started to drive the movable plates and the partition plates to be lifted upwards, and gaps between the bricks can be filled with mortar in the lifting process.
本发明公开了一种墙体砌筑装置及其砌筑方法,包括两个竖板、位移调节机构、分隔输浆机构以及自动控制机构;两个所述竖板相对称设置,两个所述竖板的相对一面均固定连接有横板,两个所述横板的相对一侧设有支撑板,所述竖板的底部安装有万向轮;所述分隔输浆机构安装于所述支撑板的底部;本发明使用时,通过启动气缸调节活动板以及隔板的垂直方向位置,使隔板底部贴合在墙体顶部砌砖处,并将砖块沿着隔板进行摆放,并利用输浆管输送砌筑砂浆,砂浆输浆管后进入隔板内部的三通管,并通过三通管底部两端出口输送至墙体顶部砖块之间,输送的同时,启动气缸驱动活动板和隔板向上抬升,抬升的过程中砂浆能够填充补满各个砖块之间的缝隙。
The invention discloses a wall building device and a building method thereof. The wall building device comprises two vertical plates, a displacement adjusting mechanism, a separation mortar conveying mechanism and an automatic control mechanism. The two vertical plates are symmetrically arranged, transverse plates are fixedly connected to the opposite faces of the two vertical plates, supporting plates are arranged on the opposite sides of the two transverse plates, and universal wheels are installed at the bottoms of the vertical plates; the separation slurry conveying mechanism is mounted at the bottom of the supporting plate; during use, the air cylinder is started to adjust the positions of the movable plate and the partition plate in the vertical direction, the bottom of the partition plate is attached to the bricklaying position of the top of a wall, bricks are placed along the partition plate, masonry mortar is conveyed through the mortar conveying pipe, and the mortar enters the three-way pipe in the partition plate after passing through the mortar conveying pipe; and during conveying, the air cylinders are started to drive the movable plates and the partition plates to be lifted upwards, and gaps between the bricks can be filled with mortar in the lifting process.
本发明公开了一种墙体砌筑装置及其砌筑方法,包括两个竖板、位移调节机构、分隔输浆机构以及自动控制机构;两个所述竖板相对称设置,两个所述竖板的相对一面均固定连接有横板,两个所述横板的相对一侧设有支撑板,所述竖板的底部安装有万向轮;所述分隔输浆机构安装于所述支撑板的底部;本发明使用时,通过启动气缸调节活动板以及隔板的垂直方向位置,使隔板底部贴合在墙体顶部砌砖处,并将砖块沿着隔板进行摆放,并利用输浆管输送砌筑砂浆,砂浆输浆管后进入隔板内部的三通管,并通过三通管底部两端出口输送至墙体顶部砖块之间,输送的同时,启动气缸驱动活动板和隔板向上抬升,抬升的过程中砂浆能够填充补满各个砖块之间的缝隙。
Masonry wall mortar joint thickness control device and masonry wall masonry method
European Patent Office | 2020
|Grouting masonry wall structure and masonry method thereof
European Patent Office | 2023
|Masonry reinforcing structure, masonry wall and construction method of masonry wall
European Patent Office | 2023
|