A platform for research: civil engineering, architecture and urbanism
Pipe gallery and subway connecting structure
The invention discloses a pipe gallery and metro connecting structure which comprises pipe gallery working wells arranged on the inner side and the outer side of a metro station entrance and exit and the inner side and the outer side of a metro station ventilation pavilion. The pipe gallery working well is arranged underground and comprises a personnel access, a ventilation opening, a discharging opening, an equipment room, a pipe gallery body and a staircase. The personnel entrance and exit is communicated with the subway station entrance and exit and the subway station ventilation kiosk; the position of the feed opening corresponds to the position of the equipment room; and the staircase is used for communicating the pipe gallery body, the equipment room and the personnel access. The comprehensive pipe gallery working well is reasonable in structural design, affiliated combination of the comprehensive pipe gallery working well and urban rail transit engineering (metro) is achieved, resource sharing can be achieved, the comprehensive pipe gallery working well and the urban rail transit engineering share land, intensive design is achieved, and urban land is effectively utilized.
本发明公开了一种管廊与地铁连接结构,包括:管廊工作井,所述管廊工作井分别设置于地铁车站出入口的内外侧、地铁车站风亭的内外侧;所述管廊工作井设置于地面下,包括人员出入口、通风口、下料口、设备用房、管廊廊体以及楼梯间;所述人员出入口与所述地铁车站出入口、地铁车站风亭相通;所述下料口的位置与设备用房的位置相对应;所述楼梯间用于联通管廊廊体、设备用房以及人员出入口。其结构设计合理,实现综合管廊工作井与城市轨道交通工程(地铁)附属结合,可实现资源共享,两者共用用地,集约化设计,有效利用城市土地。
Pipe gallery and subway connecting structure
The invention discloses a pipe gallery and metro connecting structure which comprises pipe gallery working wells arranged on the inner side and the outer side of a metro station entrance and exit and the inner side and the outer side of a metro station ventilation pavilion. The pipe gallery working well is arranged underground and comprises a personnel access, a ventilation opening, a discharging opening, an equipment room, a pipe gallery body and a staircase. The personnel entrance and exit is communicated with the subway station entrance and exit and the subway station ventilation kiosk; the position of the feed opening corresponds to the position of the equipment room; and the staircase is used for communicating the pipe gallery body, the equipment room and the personnel access. The comprehensive pipe gallery working well is reasonable in structural design, affiliated combination of the comprehensive pipe gallery working well and urban rail transit engineering (metro) is achieved, resource sharing can be achieved, the comprehensive pipe gallery working well and the urban rail transit engineering share land, intensive design is achieved, and urban land is effectively utilized.
本发明公开了一种管廊与地铁连接结构,包括:管廊工作井,所述管廊工作井分别设置于地铁车站出入口的内外侧、地铁车站风亭的内外侧;所述管廊工作井设置于地面下,包括人员出入口、通风口、下料口、设备用房、管廊廊体以及楼梯间;所述人员出入口与所述地铁车站出入口、地铁车站风亭相通;所述下料口的位置与设备用房的位置相对应;所述楼梯间用于联通管廊廊体、设备用房以及人员出入口。其结构设计合理,实现综合管廊工作井与城市轨道交通工程(地铁)附属结合,可实现资源共享,两者共用用地,集约化设计,有效利用城市土地。
Pipe gallery and subway connecting structure
一种管廊与地铁连接结构
WANG XIAONA (author) / SUN JING (author) / LI LINLIN (author) / XIE FENGBO (author) / DAI YONGXING (author) / MENG JINLING (author) / ZOU XIAOWEN (author) / LIN WEIHE (author) / CHEN XIAOLI (author)
2023-03-14
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Subway station and comprehensive pipe gallery device and road structure
European Patent Office | 2022
|Construction method of subway vehicle section pipe gallery
European Patent Office | 2020
|Pipe gallery construction method for upper-span subway passage
European Patent Office | 2021
|