Steel rail telescopic adjuster and beam end telescopic device integrated laying construction method
The invention discloses a steel rail telescopic adjuster and beam end telescopic device integrated laying construction method which comprises the following steps that a replacement telescopic adjuster and a beam end telescopic device are laid, and the replacement telescopic adjuster is of a structure that a sharp base rail in a standard steel rail telescopic adjuster is replaced with a tool rail; seamless tracks on the two sides of the beam seam are laid; and the tool rail is dismantled, and the sharp base rail is installed, so that the standard steel rail telescopic adjuster is formed. Under the condition that seamless tracks are not laid on the left side and the right side of a beam seam, the regulator and a beam-end telescopic device sleeper are laid in advance, a tool track is used for replacing a sharp base track to temporarily lay the track, follow-up track construction is conducted, and then the sharp base track of the steel rail telescopic regulator is laid, so that the construction efficiency is improved; damage to the steel rail pieces in the engineering line transportation and large machine tamping process is avoided, the problem of advance laying and the defects caused by an insertion laying method are solved, and the problem that the steel rail telescopic adjuster is inconvenient to lay is effectively solved.
本发明公开了一种钢轨伸缩调节器及梁端伸缩装置一体化铺设施工方法,包括如下步骤:铺设替代伸缩调节器以及梁端伸缩装置,所述替代伸缩调节器为标准钢轨伸缩调节器中尖基轨替换为工具轨的结构;铺设梁缝两侧的无缝线路;拆除所述工具轨,并安装所述尖基轨,以形成所述标准钢轨伸缩调节器。在梁缝左右侧尚未铺设无缝线路的条件下先行铺设调节器及梁端伸缩装置轨枕,使用工具轨代替尖基轨临时铺通线路,进行后续线路施工,而后换铺钢轨伸缩调节器的尖基轨,提高了施工工效,避免了工程线运输及大机捣固过程对钢轨件的损伤,解决了先行铺设难题及插铺法带来的弊端,以有效地解决钢轨伸缩调节器铺设不方便的问题。
Steel rail telescopic adjuster and beam end telescopic device integrated laying construction method
The invention discloses a steel rail telescopic adjuster and beam end telescopic device integrated laying construction method which comprises the following steps that a replacement telescopic adjuster and a beam end telescopic device are laid, and the replacement telescopic adjuster is of a structure that a sharp base rail in a standard steel rail telescopic adjuster is replaced with a tool rail; seamless tracks on the two sides of the beam seam are laid; and the tool rail is dismantled, and the sharp base rail is installed, so that the standard steel rail telescopic adjuster is formed. Under the condition that seamless tracks are not laid on the left side and the right side of a beam seam, the regulator and a beam-end telescopic device sleeper are laid in advance, a tool track is used for replacing a sharp base track to temporarily lay the track, follow-up track construction is conducted, and then the sharp base track of the steel rail telescopic regulator is laid, so that the construction efficiency is improved; damage to the steel rail pieces in the engineering line transportation and large machine tamping process is avoided, the problem of advance laying and the defects caused by an insertion laying method are solved, and the problem that the steel rail telescopic adjuster is inconvenient to lay is effectively solved.
本发明公开了一种钢轨伸缩调节器及梁端伸缩装置一体化铺设施工方法,包括如下步骤:铺设替代伸缩调节器以及梁端伸缩装置,所述替代伸缩调节器为标准钢轨伸缩调节器中尖基轨替换为工具轨的结构;铺设梁缝两侧的无缝线路;拆除所述工具轨,并安装所述尖基轨,以形成所述标准钢轨伸缩调节器。在梁缝左右侧尚未铺设无缝线路的条件下先行铺设调节器及梁端伸缩装置轨枕,使用工具轨代替尖基轨临时铺通线路,进行后续线路施工,而后换铺钢轨伸缩调节器的尖基轨,提高了施工工效,避免了工程线运输及大机捣固过程对钢轨件的损伤,解决了先行铺设难题及插铺法带来的弊端,以有效地解决钢轨伸缩调节器铺设不方便的问题。
Steel rail telescopic adjuster and beam end telescopic device integrated laying construction method
一种钢轨伸缩调节器及梁端伸缩装置一体化铺设施工方法
WU QIXIN (author) / REN JIHONG (author) / WANG JUN (author) / CHEN BENJIAN (author) / YAO HONGXIANG (author) / ZHU JIANFU (author) / WU QUAN (author) / XU DAN (author) / WANG JING (author) / WEN PENG (author)
2023-03-21
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Beam end telescopic device for steel rail telescopic adjuster
European Patent Office | 2024
|European Patent Office | 2023
|Steel rail telescopic adjuster and arrangement mode of steel rail telescopic adjuster
European Patent Office | 2024
|Installation method for installing track telescopic device and steel rail telescopic adjuster
European Patent Office | 2023
|Beam end steel rail telescopic device and telescopic method for movable bridge
European Patent Office | 2022
|