Basement top plate reinforcing assembly and basement top plate reinforcing construction method
The invention relates to the technical field of building construction in large public places, and discloses a basement top plate reinforcing assembly and a basement top plate reinforcing construction method.The basement top plate reinforcing structure comprises a steel beam, first supporting columns, connecting pieces and a ground pouring foundation; the first supporting column is arranged on the steel beam, the ground pouring foundation is arranged on the basement ground corresponding to the first supporting column, the extending end, away from the steel beam, of the first supporting column and the ground pouring foundation are arranged in a spaced mode, and the connecting piece is used for connecting the first supporting column and the ground pouring foundation. Load on the steel beam is transmitted to the ground pouring foundation through the first supporting column to be detached. The technical problems that due to the fact that an all-round support is adopted for reinforcing an existing basement top plate, the structure is complex, maintenance and overhaul are inconvenient, the construction period is long, a large amount of manpower and material resources are consumed, or a profile steel supporting mode is high in manufacturing cost, and later reinforcing structure dismantling is not facilitated are solved.
本发明涉及大型公共场所建筑施工技术领域,公开一种地下室顶板加固组件和地下室顶板加固的施工方法,地下室顶板加固结构包括钢梁、第一支撑柱、连接件和地面浇筑基础,钢梁垂直于地下室顶板的横向方向设置,第一支撑柱设置在钢梁上,地面浇筑基础对应第一支撑柱设置在地下室地面上,第一支撑柱背离钢梁的延伸端与地面浇筑基础间隔设置,连接件用于连接第一支撑柱和地面浇筑基础,以将钢梁上的荷载通过第一支撑柱传导至地面浇筑基础拆卸。本发明解决了由于现有的地下室顶板加固采用满堂彩支架存在结构复杂不便于维护检修、工期长耗费大量的人力物力,或者采用型钢支撑方式存在造价高、不利于后期加固结构拆除的技术问题。
Basement top plate reinforcing assembly and basement top plate reinforcing construction method
The invention relates to the technical field of building construction in large public places, and discloses a basement top plate reinforcing assembly and a basement top plate reinforcing construction method.The basement top plate reinforcing structure comprises a steel beam, first supporting columns, connecting pieces and a ground pouring foundation; the first supporting column is arranged on the steel beam, the ground pouring foundation is arranged on the basement ground corresponding to the first supporting column, the extending end, away from the steel beam, of the first supporting column and the ground pouring foundation are arranged in a spaced mode, and the connecting piece is used for connecting the first supporting column and the ground pouring foundation. Load on the steel beam is transmitted to the ground pouring foundation through the first supporting column to be detached. The technical problems that due to the fact that an all-round support is adopted for reinforcing an existing basement top plate, the structure is complex, maintenance and overhaul are inconvenient, the construction period is long, a large amount of manpower and material resources are consumed, or a profile steel supporting mode is high in manufacturing cost, and later reinforcing structure dismantling is not facilitated are solved.
本发明涉及大型公共场所建筑施工技术领域,公开一种地下室顶板加固组件和地下室顶板加固的施工方法,地下室顶板加固结构包括钢梁、第一支撑柱、连接件和地面浇筑基础,钢梁垂直于地下室顶板的横向方向设置,第一支撑柱设置在钢梁上,地面浇筑基础对应第一支撑柱设置在地下室地面上,第一支撑柱背离钢梁的延伸端与地面浇筑基础间隔设置,连接件用于连接第一支撑柱和地面浇筑基础,以将钢梁上的荷载通过第一支撑柱传导至地面浇筑基础拆卸。本发明解决了由于现有的地下室顶板加固采用满堂彩支架存在结构复杂不便于维护检修、工期长耗费大量的人力物力,或者采用型钢支撑方式存在造价高、不利于后期加固结构拆除的技术问题。
Basement top plate reinforcing assembly and basement top plate reinforcing construction method
地下室顶板加固组件和地下室顶板加固的施工方法
HU QINGKANG (author) / ZHANG KESHENG (author) / REN BAOSHUANG (author) / YU ZHIWEI (author) / XIE WEI (author) / ZHAI HAOBO (author) / SONG ZHUOHUA (author) / LI YUEHUI (author) / WEN JIE (author)
2023-03-21
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Basement top plate reinforcing system and construction method
European Patent Office | 2023
|Basement floor plate crack reinforcing and repairing construction method
European Patent Office | 2021
|Basement operation reinforcing structure and construction method
European Patent Office | 2022
|