Hole plugging process and plugging structure thereof
The invention belongs to the technical field of floor hole plugging, and particularly relates to a hole plugging process. The method comprises the following steps: prefabricating a bottom plate layer with a first hole, pouring a cast-in-place layer on the bottom plate layer, reserving a second hole around the first hole in the cast-in-place layer, forming a step-shaped hole by the second hole and the first hole, performing waterproof treatment on corners of four sides of a step surface of the step-shaped hole, and reinforcing a plurality of layers of reinforcing rib meshes on connecting keys. Treating the periphery of the hole, erecting a formwork below the hole to pour concrete, curing the concrete, and removing the formwork after the concrete reaches certain strength. The method is used for solving the problems that the steel bar planting effect is poor and leakage is prone to occurring when holes such as a pay-off hole and a pump pipe hole are blocked.
本发明属于楼层洞口封堵技术领域,尤其涉及一种孔洞封堵工艺。其包括以下步骤:预制留有第一洞口的底板层,在底板层上浇筑现浇层,现浇层在第一洞口四周预留第二洞口,第二洞口与第一洞口形成阶梯状洞口,在阶梯状洞口台阶面四边的角部进行防水处理,在连接键上加固多层加强筋网片,处理洞口周边并在洞口下方支模以浇注混凝土,养护混凝土,当混凝土达到一定强度后拆除模板。本发明用于解决放线洞、泵管洞等洞口封堵时植筋效果不好且容易渗漏的问题。
Hole plugging process and plugging structure thereof
The invention belongs to the technical field of floor hole plugging, and particularly relates to a hole plugging process. The method comprises the following steps: prefabricating a bottom plate layer with a first hole, pouring a cast-in-place layer on the bottom plate layer, reserving a second hole around the first hole in the cast-in-place layer, forming a step-shaped hole by the second hole and the first hole, performing waterproof treatment on corners of four sides of a step surface of the step-shaped hole, and reinforcing a plurality of layers of reinforcing rib meshes on connecting keys. Treating the periphery of the hole, erecting a formwork below the hole to pour concrete, curing the concrete, and removing the formwork after the concrete reaches certain strength. The method is used for solving the problems that the steel bar planting effect is poor and leakage is prone to occurring when holes such as a pay-off hole and a pump pipe hole are blocked.
本发明属于楼层洞口封堵技术领域,尤其涉及一种孔洞封堵工艺。其包括以下步骤:预制留有第一洞口的底板层,在底板层上浇筑现浇层,现浇层在第一洞口四周预留第二洞口,第二洞口与第一洞口形成阶梯状洞口,在阶梯状洞口台阶面四边的角部进行防水处理,在连接键上加固多层加强筋网片,处理洞口周边并在洞口下方支模以浇注混凝土,养护混凝土,当混凝土达到一定强度后拆除模板。本发明用于解决放线洞、泵管洞等洞口封堵时植筋效果不好且容易渗漏的问题。
Hole plugging process and plugging structure thereof
一种孔洞封堵工艺及其封堵结构
YANG YUN (author) / TANG JING (author) / CHEN LIANG (author) / LI WANWEI (author) / HAN RUQUAN (author) / JIANG JIE (author) / JIAO YANG (author) / DAI YUAN (author)
2023-03-21
Patent
Electronic Resource
Chinese