A platform for research: civil engineering, architecture and urbanism
Construction method of outwards-inclined large-span inhaul cable curtain wall
The invention relates to a construction method of an externally inclined large-span inhaul cable curtain wall. The construction method comprises the following steps: (1) mounting an on-site all-round scaffold; (2) a stay cable is installed, and the stay cable is tensioned; (3) curtain wall glass is installed, and the installed curtain wall glass is supported through a temporary jacking device; (4) sealing glue injection is conducted, specifically, after all curtain wall glass is installed, sealing glue injection is conducted, and all the temporary jacking and supporting devices are kept in place; and (5) the temporary jacking device is dismantled, after the sealant is immobilized and reaches the structural strength, the temporary jacking device is dismantled, and installation is completed. According to the construction method of the outwards-inclined large-span inhaul cable curtain wall, the construction process is standard, the construction efficiency is high, and the construction quality is guaranteed.
一种外倾斜大跨度拉索幕墙施工方法,包括下列步骤:(1)现场满堂脚手架的安装;(2)斜拉索的安装,并对斜拉索进行张拉;(3)幕墙玻璃的安装,并采用临时顶撑装置对安装好的幕墙玻璃进行支撑;(4)密封注胶,所有幕墙玻璃安装完毕后密封注胶,且保持各临时顶撑装置到位;(5)拆除临时顶撑装置,待密封胶固定化并达到结构强度后,拆除临时顶撑装置,安装完成。本发明外倾斜大跨度拉索幕墙施工方法,其施工过程规范,施工效率高,施工质量有保证。
Construction method of outwards-inclined large-span inhaul cable curtain wall
The invention relates to a construction method of an externally inclined large-span inhaul cable curtain wall. The construction method comprises the following steps: (1) mounting an on-site all-round scaffold; (2) a stay cable is installed, and the stay cable is tensioned; (3) curtain wall glass is installed, and the installed curtain wall glass is supported through a temporary jacking device; (4) sealing glue injection is conducted, specifically, after all curtain wall glass is installed, sealing glue injection is conducted, and all the temporary jacking and supporting devices are kept in place; and (5) the temporary jacking device is dismantled, after the sealant is immobilized and reaches the structural strength, the temporary jacking device is dismantled, and installation is completed. According to the construction method of the outwards-inclined large-span inhaul cable curtain wall, the construction process is standard, the construction efficiency is high, and the construction quality is guaranteed.
一种外倾斜大跨度拉索幕墙施工方法,包括下列步骤:(1)现场满堂脚手架的安装;(2)斜拉索的安装,并对斜拉索进行张拉;(3)幕墙玻璃的安装,并采用临时顶撑装置对安装好的幕墙玻璃进行支撑;(4)密封注胶,所有幕墙玻璃安装完毕后密封注胶,且保持各临时顶撑装置到位;(5)拆除临时顶撑装置,待密封胶固定化并达到结构强度后,拆除临时顶撑装置,安装完成。本发明外倾斜大跨度拉索幕墙施工方法,其施工过程规范,施工效率高,施工质量有保证。
Construction method of outwards-inclined large-span inhaul cable curtain wall
外倾斜大跨度拉索幕墙施工方法
PENG QUN (author) / FU XIAOBING (author) / ZHANG YINGZHI (author) / YIN LISHA (author) / DU ZHONGAN (author) / ZHANG JIE (author) / XU ZINIU (author) / HU SHUKANG (author)
2023-03-24
Patent
Electronic Resource
Chinese
Construction method of large-span high-overhead inhaul cable point glass curtain wall
European Patent Office | 2024
|Construction method for large-weight outwards-inclined glass curtain wall
European Patent Office | 2024
|European Patent Office | 2023
|European Patent Office | 2023
|Design and construction method for ultrahigh truss inhaul cable type inclined curtain wall
European Patent Office | 2024
|