Method for supporting bottom formwork of middle tower column
The invention discloses a supporting method for a bottom formwork of a middle tower column, and belongs to the technical field of constructional engineering. According to the supporting method for the middle tower column bottom formwork, compared with the problem that in the prior art, the supporting effect of a supporting system for the middle tower column bottom formwork is poor, the method comprises the steps that the middle tower column bottom formwork to be supported is determined; based on the bottom formwork of the middle tower column, adopted steel pipes are determined, and the bottom formwork is supported based on the steel pipes; determining a pull rod for temporary supporting based on the embedded steel bar position in the middle tower column; and the middle tower column bottom formwork is supported based on an opposite-pulling system formed by the pull rods. According to the method, the corresponding steel pipes and the temporarily-supported pull rods are determined based on the to-be-supported middle tower column formwork, the opposite-pull system formed by the pull rods is related to the actual stress state, the stress balance of the middle tower column and the reinforcing effect on the middle tower column are guaranteed, and the supporting effect of the bottom formwork of the middle tower column is improved.
本申请公开了一种中塔柱底部模板的支撑方法,属于建筑工程技术领域。本申请提出一种中塔柱底部模板的支撑方法,与现有技术中中塔柱底部模板的支撑系统的支撑效果不佳的问题相比,本申请确定待支撑的中塔柱底部模板;基于所述中塔柱底部模板,确定所采用的钢管,基于所述钢管进行支撑所述底部模板;基于中塔柱中的植筋位置,确定用于临时支撑的拉杆;基于所述拉杆形成的对拉体系,对所述中塔柱底部模板进行支撑。本申请中基于待支撑的中塔柱模板,确定对应的钢管以及临时支撑的拉杆,拉杆形成的对拉体系与实际受力状态有关,保证了中塔柱的受力平衡,以及对中塔柱的加固作用,即提高了中塔柱底部模板的支撑效果。
Method for supporting bottom formwork of middle tower column
The invention discloses a supporting method for a bottom formwork of a middle tower column, and belongs to the technical field of constructional engineering. According to the supporting method for the middle tower column bottom formwork, compared with the problem that in the prior art, the supporting effect of a supporting system for the middle tower column bottom formwork is poor, the method comprises the steps that the middle tower column bottom formwork to be supported is determined; based on the bottom formwork of the middle tower column, adopted steel pipes are determined, and the bottom formwork is supported based on the steel pipes; determining a pull rod for temporary supporting based on the embedded steel bar position in the middle tower column; and the middle tower column bottom formwork is supported based on an opposite-pulling system formed by the pull rods. According to the method, the corresponding steel pipes and the temporarily-supported pull rods are determined based on the to-be-supported middle tower column formwork, the opposite-pull system formed by the pull rods is related to the actual stress state, the stress balance of the middle tower column and the reinforcing effect on the middle tower column are guaranteed, and the supporting effect of the bottom formwork of the middle tower column is improved.
本申请公开了一种中塔柱底部模板的支撑方法,属于建筑工程技术领域。本申请提出一种中塔柱底部模板的支撑方法,与现有技术中中塔柱底部模板的支撑系统的支撑效果不佳的问题相比,本申请确定待支撑的中塔柱底部模板;基于所述中塔柱底部模板,确定所采用的钢管,基于所述钢管进行支撑所述底部模板;基于中塔柱中的植筋位置,确定用于临时支撑的拉杆;基于所述拉杆形成的对拉体系,对所述中塔柱底部模板进行支撑。本申请中基于待支撑的中塔柱模板,确定对应的钢管以及临时支撑的拉杆,拉杆形成的对拉体系与实际受力状态有关,保证了中塔柱的受力平衡,以及对中塔柱的加固作用,即提高了中塔柱底部模板的支撑效果。
Method for supporting bottom formwork of middle tower column
中塔柱底部模板的支撑方法
FENG LONG (author) / ZHAO ABING (author) / LI DONG (author) / ZHAO CHANGXU (author) / ZHANG HUALIN (author) / HE WENJIAN (author)