A platform for research: civil engineering, architecture and urbanism
Aluminum alloy operation hanging frame for high-altitude radial gate and building method of aluminum alloy operation hanging frame
The invention relates to an aluminum alloy operation hanging frame for a high-altitude radial gate and a building method thereof.The aluminum alloy operation hanging frame comprises a plurality of magnetic attraction bases arranged at the top of the radial gate, a truss is arranged on the magnetic attraction bases, and bearing hanging frames used for supporting the truss are arranged at the two ends of the truss correspondingly; the bearing hanging frame comprises two oppositely-arranged portal frame pieces and a plurality of installation transverse rods arranged between the two portal frame pieces. Firstly, a magnetic attraction seat is adjusted to a proper angle according to the angle of the slope surface of the radial gate, so that a top plate of the magnetic attraction seat is kept horizontal, then the magnetic attraction seat is installed on the slope surface of the radial gate, then a corresponding truss is installed on the top plate of the magnetic attraction seat, and finally multiple sets of bearing hanging frames are erected in the direction from top to bottom with the truss as the starting point. The erecting mode of a traditional steel pipe working frame is broken through, the idea of a cantilever frame and the idea of the working frame are combined, the overall structure is simple, stress is definite, and the problem of high-altitude maintenance operation of the radial gate is solved.
本发明涉及一种用于高空弧门的铝合金作业挂架及其搭建方法,其包括设置在弧门顶部的多个磁吸座,磁吸座上设置有桁架,桁架的两端分别设有用于对其实现支撑的承载挂架;承载挂架包括两个相对设置的门架片、设置于两个门架片之间的多个安装横杆;首先根据弧门坡面的角度将磁吸座调整至合适的角度,使得磁吸座的顶板保持水平,然后将磁吸座安装在弧门的坡面上,之后在磁吸座的顶板上安装对应的桁架,最后以桁架为起点,沿着从上往下的方向搭设有多组承载挂架。本申请打破了传统钢管工作架的搭设方式,将悬挑架的理念与工作架理念结合,整体构造简单,受力明确,解决了弧门高空维修作业的难题。
Aluminum alloy operation hanging frame for high-altitude radial gate and building method of aluminum alloy operation hanging frame
The invention relates to an aluminum alloy operation hanging frame for a high-altitude radial gate and a building method thereof.The aluminum alloy operation hanging frame comprises a plurality of magnetic attraction bases arranged at the top of the radial gate, a truss is arranged on the magnetic attraction bases, and bearing hanging frames used for supporting the truss are arranged at the two ends of the truss correspondingly; the bearing hanging frame comprises two oppositely-arranged portal frame pieces and a plurality of installation transverse rods arranged between the two portal frame pieces. Firstly, a magnetic attraction seat is adjusted to a proper angle according to the angle of the slope surface of the radial gate, so that a top plate of the magnetic attraction seat is kept horizontal, then the magnetic attraction seat is installed on the slope surface of the radial gate, then a corresponding truss is installed on the top plate of the magnetic attraction seat, and finally multiple sets of bearing hanging frames are erected in the direction from top to bottom with the truss as the starting point. The erecting mode of a traditional steel pipe working frame is broken through, the idea of a cantilever frame and the idea of the working frame are combined, the overall structure is simple, stress is definite, and the problem of high-altitude maintenance operation of the radial gate is solved.
本发明涉及一种用于高空弧门的铝合金作业挂架及其搭建方法,其包括设置在弧门顶部的多个磁吸座,磁吸座上设置有桁架,桁架的两端分别设有用于对其实现支撑的承载挂架;承载挂架包括两个相对设置的门架片、设置于两个门架片之间的多个安装横杆;首先根据弧门坡面的角度将磁吸座调整至合适的角度,使得磁吸座的顶板保持水平,然后将磁吸座安装在弧门的坡面上,之后在磁吸座的顶板上安装对应的桁架,最后以桁架为起点,沿着从上往下的方向搭设有多组承载挂架。本申请打破了传统钢管工作架的搭设方式,将悬挑架的理念与工作架理念结合,整体构造简单,受力明确,解决了弧门高空维修作业的难题。
Aluminum alloy operation hanging frame for high-altitude radial gate and building method of aluminum alloy operation hanging frame
用于高空弧门的铝合金作业挂架及其搭建方法
QIAN XINHUA (author) / WEN KE (author) / YAO KAI (author) / ZHANG WENJING (author)
2023-03-28
Patent
Electronic Resource
Chinese