A platform for research: civil engineering, architecture and urbanism
Improved splicing-free prefabricated cabin
The improved splicing-free prefabricated cabin comprises a cabin body, the cabin body comprises a bottom plate and a shell installed on the bottom plate, a firm connection mechanism for enhancing the firmness of connection between the bottom plate and the ground is installed at the bottom of the bottom plate, and the firm connection mechanism comprises a fixing base; and a drilling assembly and a filling assembly are installed on the fixing base, the drilling assembly is used for drilling the ground, and the filling assembly is used for filling the hole so as to enhance the connection firmness of the bottom plate and the ground. When the prefabricated cabin is placed on a plain, an electric telescopic rod drives a sliding sleeve to descend until a filling assembly moves to a side area hole, liquid is introduced into an elastic water bag, the side area hole is filled with the elastic water bag, the firmness of connection between a fixing base and the ground is enhanced, and the firmness of connection between a cabin body and the ground is enhanced; and the possibility that wind flow impacts the prefabricated cabin from one side to blow down the prefabricated cabin is reduced, and the use safety of the prefabricated cabin is improved.
本发明提供了一种改进型无拼接预制舱,包括舱体,所述舱体包括底板和安装于所述底板上的壳体,所述底板底部安装有增强底板与地面连接牢固性的连接牢固机构,所述连接牢固机构包括固定座,所述固定座上安装有钻孔组件和填充组件,所述钻孔组件对地面进行钻孔,所述填充组件对孔内进行填充以增强底板与地面连接牢固性。本发明通过将预制舱放置在平原上时,通过电动伸缩杆驱动滑动套下降,直至填充组件运动至侧边区域孔处时,弹性水囊内通入液体,使弹性水囊充满侧边区域孔,增强固定座与地面之间连接的牢固性,增强舱体与地面之间连接牢固性,降低风流从一侧冲击预制舱将其吹倒的可能性,提高了预制舱使用的安全性。
Improved splicing-free prefabricated cabin
The improved splicing-free prefabricated cabin comprises a cabin body, the cabin body comprises a bottom plate and a shell installed on the bottom plate, a firm connection mechanism for enhancing the firmness of connection between the bottom plate and the ground is installed at the bottom of the bottom plate, and the firm connection mechanism comprises a fixing base; and a drilling assembly and a filling assembly are installed on the fixing base, the drilling assembly is used for drilling the ground, and the filling assembly is used for filling the hole so as to enhance the connection firmness of the bottom plate and the ground. When the prefabricated cabin is placed on a plain, an electric telescopic rod drives a sliding sleeve to descend until a filling assembly moves to a side area hole, liquid is introduced into an elastic water bag, the side area hole is filled with the elastic water bag, the firmness of connection between a fixing base and the ground is enhanced, and the firmness of connection between a cabin body and the ground is enhanced; and the possibility that wind flow impacts the prefabricated cabin from one side to blow down the prefabricated cabin is reduced, and the use safety of the prefabricated cabin is improved.
本发明提供了一种改进型无拼接预制舱,包括舱体,所述舱体包括底板和安装于所述底板上的壳体,所述底板底部安装有增强底板与地面连接牢固性的连接牢固机构,所述连接牢固机构包括固定座,所述固定座上安装有钻孔组件和填充组件,所述钻孔组件对地面进行钻孔,所述填充组件对孔内进行填充以增强底板与地面连接牢固性。本发明通过将预制舱放置在平原上时,通过电动伸缩杆驱动滑动套下降,直至填充组件运动至侧边区域孔处时,弹性水囊内通入液体,使弹性水囊充满侧边区域孔,增强固定座与地面之间连接的牢固性,增强舱体与地面之间连接牢固性,降低风流从一侧冲击预制舱将其吹倒的可能性,提高了预制舱使用的安全性。
Improved splicing-free prefabricated cabin
一种改进型无拼接预制舱
PAN DONG (author) / JIN XINGFU (author) / LI TAO (author) / ZHU CAN (author) / YU XIAOLEI (author) / WANG LI (author) / XUE HUAN (author) / LIU ZHI (author) / JI YUE (author) / BAO YUYING (author)
2023-03-28
Patent
Electronic Resource
Chinese
Splicing construction method for multi-cabin splicing type prefabricated transformer substation
European Patent Office | 2023
|Splicing structure of split type prefabricated cabin body
European Patent Office | 2024
|Prefabricated cabin convenient to splice and splicing method thereof
European Patent Office | 2024
|European Patent Office | 2024
|European Patent Office | 2023
|