Hoisting and stacking construction method suitable for super-large-weight stones of ancient city wall
The invention provides a hoisting and stacking construction method suitable for an ancient city wall ultra-large weight stone, which comprises the following steps: firstly, constructing a concrete foundation, then forming notches in four sides of the stone, hoisting the stone to a specified position through a hoisting belt, then installing water stop rubber strips on the periphery of the stone, then pouring inorganic sealing glue into the notches of the stone, and repeating the above process. Construction of the next layer of stones is completed, and after construction of every two layers of stones is completed, a structural wall is constructed on the inner sides of the stones. The problems of low working efficiency, high cost, poor effect quality, high safety risk and the like in the traditional hoisting construction technology are effectively solved.
本发明提供了一种适用于古城墙超大重量石块的吊装叠砌施工方法,首先施工混凝土基础,然后在石块四面开设槽口,通过吊带吊装石块至指定位置,然后在石块四周安装止水胶条,再向石块的槽口内灌注无机封闭胶,重复上述过程,完成下一层石块的施工,且每两层石块施工完成后,就在石块内侧施工结构墙。本发明有效解决了传统吊装施工技术所存在的工效慢、成本高、成效质量差、安全风险高等问题。
Hoisting and stacking construction method suitable for super-large-weight stones of ancient city wall
The invention provides a hoisting and stacking construction method suitable for an ancient city wall ultra-large weight stone, which comprises the following steps: firstly, constructing a concrete foundation, then forming notches in four sides of the stone, hoisting the stone to a specified position through a hoisting belt, then installing water stop rubber strips on the periphery of the stone, then pouring inorganic sealing glue into the notches of the stone, and repeating the above process. Construction of the next layer of stones is completed, and after construction of every two layers of stones is completed, a structural wall is constructed on the inner sides of the stones. The problems of low working efficiency, high cost, poor effect quality, high safety risk and the like in the traditional hoisting construction technology are effectively solved.
本发明提供了一种适用于古城墙超大重量石块的吊装叠砌施工方法,首先施工混凝土基础,然后在石块四面开设槽口,通过吊带吊装石块至指定位置,然后在石块四周安装止水胶条,再向石块的槽口内灌注无机封闭胶,重复上述过程,完成下一层石块的施工,且每两层石块施工完成后,就在石块内侧施工结构墙。本发明有效解决了传统吊装施工技术所存在的工效慢、成本高、成效质量差、安全风险高等问题。
Hoisting and stacking construction method suitable for super-large-weight stones of ancient city wall
一种适用于古城墙超大重量石块的吊装叠砌施工方法
MA LEI (author) / DUAN HONGCHUAN (author) / YANG GUANGXU (author) / ZHU HUASONG (author) / MEI JIANGTAO (author)
2023-04-04
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|European Patent Office | 2024
|Hoisting method for indoor inclined curtain wall super-large glass
European Patent Office | 2015
|Energy-saving curtain wall hoisting equipment and curtain wall hoisting construction method
European Patent Office | 2021
|