A platform for research: civil engineering, architecture and urbanism
Hoisting method for indoor inclined curtain wall super-large glass
The invention discloses a hoisting method for indoor inclined curtain wall super-large glass. The hoisting method comprises the steps that a girder frame perpendicular to the length direction of a curtain wall under construction is arranged on the top beam of the curtain wall under construction; an elevating mechanism capable of translating along the length direction of the girder frame is slidably arranged on the girder frame; a sucking disc is arranged on the elevating mechanism; curtain wall stay cables are arranged on the top beam and the bottom part structure of the curtain wall under construction in a stretching and drawing way; linking members used for installing curtain wall glass of the curtain wall under construction are arranged on the curtain wall stay cables, and the linking members are provided with linking grooves; curtain wall glass is installed; the girder frame is moved to the position above the installing position of curtain wall glass to be installed, curtain wall glass is adsorbed on the sucking disc, and curtain wall glass is moved to the installing position by utilizing the elevating mechanism and is installed in the linking grooves of the linking members; and the steps for installing curtain wall glass are repeated, and all curtain wall glass is installed completely according to the preset installing sequence of curtain wall glass. Curtain wall glass can bidirectionally move in horizontal and vertical directions so that construction is high-efficiency.
Hoisting method for indoor inclined curtain wall super-large glass
The invention discloses a hoisting method for indoor inclined curtain wall super-large glass. The hoisting method comprises the steps that a girder frame perpendicular to the length direction of a curtain wall under construction is arranged on the top beam of the curtain wall under construction; an elevating mechanism capable of translating along the length direction of the girder frame is slidably arranged on the girder frame; a sucking disc is arranged on the elevating mechanism; curtain wall stay cables are arranged on the top beam and the bottom part structure of the curtain wall under construction in a stretching and drawing way; linking members used for installing curtain wall glass of the curtain wall under construction are arranged on the curtain wall stay cables, and the linking members are provided with linking grooves; curtain wall glass is installed; the girder frame is moved to the position above the installing position of curtain wall glass to be installed, curtain wall glass is adsorbed on the sucking disc, and curtain wall glass is moved to the installing position by utilizing the elevating mechanism and is installed in the linking grooves of the linking members; and the steps for installing curtain wall glass are repeated, and all curtain wall glass is installed completely according to the preset installing sequence of curtain wall glass. Curtain wall glass can bidirectionally move in horizontal and vertical directions so that construction is high-efficiency.
Hoisting method for indoor inclined curtain wall super-large glass
TANG JIYU (author) / HUANG YEXIN (author) / WANG WEI (author) / GUO SHENGWEN (author) / LIANG QIUYING (author) / ZHANG JIEKE (author)
2015-08-12
Patent
Electronic Resource
English
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Building glass curtain wall automatic hoisting machine and hoisting method
European Patent Office | 2020
|European Patent Office | 2024
|Energy-saving curtain wall hoisting equipment and curtain wall hoisting construction method
European Patent Office | 2021
|