A platform for research: civil engineering, architecture and urbanism
Construction method of embedded bamboo skeleton combined wall body
The invention discloses an embedded type bamboo framework combined wall body which is composed of a bamboo chip set, bolts, gridding cloth or a galvanized mesh and light concrete. Load-bearing components of the wall are round bamboo chip sets connected through screws, namely bamboo springboards, the round bamboo chip sets are longitudinally and transversely arranged at certain intervals, the cross positions of the transverse round bamboo chip sets and the vertical round bamboo chip sets are connected through bolts to form the lattice type rigid wall, then light concrete is poured in a mold frame, and the finished wall is formed after maintenance. A wall body width groove is reserved in the ground, during installation, a wall body is firstly embedded into the groove, the wall body is straightened and reinforced at the hoisting holes through supporting wood, then a mold is made at the upper end of the wall body, and a groove is formed in the lower end of the mold frame. And the wall body is completed along with a main body structure project. When the house is disassembled, the structural beam is sawed off, and the wall body is taken out for reuse. The wall body is fireproof and soundproof, and is a new option of a high-rise building wall body. Bamboo wood is used, carbon emission is reduced, and income of farmers is increased.
本发明公开了一种由竹片组、螺栓和网格布或镀锌网及轻质混凝士组成的崁入式竹骨架组合墙体。此墙体的承重构件为螺杆连接的圆竹片组即竹跳板,选择一定间距纵横排列,在横向和竖向圆竹片组交叉处由螺栓连接,形成格构式刚性墙体,然后在模框内用轻质混凝土浇注,养护好后即成为成品墙体。在地面预留墙体宽度凹槽,安装时先将墙体植入凹槽,用支木在吊装孔处将墙体扶正加固,再在墙体上端制模,该模框下端设有凹槽。墙体随主体结构工程一起竣工。拆房时,将结构梁锯断,取出墙体重复使用。此墙体防火、隔声,是高层建筑墙体的新选项。使用竹材,将降低碳排和增加农民收入。
Construction method of embedded bamboo skeleton combined wall body
The invention discloses an embedded type bamboo framework combined wall body which is composed of a bamboo chip set, bolts, gridding cloth or a galvanized mesh and light concrete. Load-bearing components of the wall are round bamboo chip sets connected through screws, namely bamboo springboards, the round bamboo chip sets are longitudinally and transversely arranged at certain intervals, the cross positions of the transverse round bamboo chip sets and the vertical round bamboo chip sets are connected through bolts to form the lattice type rigid wall, then light concrete is poured in a mold frame, and the finished wall is formed after maintenance. A wall body width groove is reserved in the ground, during installation, a wall body is firstly embedded into the groove, the wall body is straightened and reinforced at the hoisting holes through supporting wood, then a mold is made at the upper end of the wall body, and a groove is formed in the lower end of the mold frame. And the wall body is completed along with a main body structure project. When the house is disassembled, the structural beam is sawed off, and the wall body is taken out for reuse. The wall body is fireproof and soundproof, and is a new option of a high-rise building wall body. Bamboo wood is used, carbon emission is reduced, and income of farmers is increased.
本发明公开了一种由竹片组、螺栓和网格布或镀锌网及轻质混凝士组成的崁入式竹骨架组合墙体。此墙体的承重构件为螺杆连接的圆竹片组即竹跳板,选择一定间距纵横排列,在横向和竖向圆竹片组交叉处由螺栓连接,形成格构式刚性墙体,然后在模框内用轻质混凝土浇注,养护好后即成为成品墙体。在地面预留墙体宽度凹槽,安装时先将墙体植入凹槽,用支木在吊装孔处将墙体扶正加固,再在墙体上端制模,该模框下端设有凹槽。墙体随主体结构工程一起竣工。拆房时,将结构梁锯断,取出墙体重复使用。此墙体防火、隔声,是高层建筑墙体的新选项。使用竹材,将降低碳排和增加农民收入。
Construction method of embedded bamboo skeleton combined wall body
一种崁入式竹骨架组合墙体的建造方法
LI DENGMAN (author)
2023-04-04
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Embedded part wall connecting joint and wall body construction method
European Patent Office | 2023
|European Patent Office | 2020