A platform for research: civil engineering, architecture and urbanism
Plain concrete pile head girdling and cleaning method
The invention discloses a plain concrete pile head girdling and cleaning method which comprises the steps that a cutting device is installed on a connecting rod structure between a movable wall and a hopper of an excavator, the excavator is conveyed to a construction site, and the cutting device comprises a circular saw blade; then the excavator puts a circular saw blade of a cutting device to a horizontal position by controlling a movable arm, the circular saw blade is annularly close to the pile head, then the cutting device is started, and the circular saw blade rotating at a high speed is used for cutting the pile head; and after the pile head girdling is completed, a hopper of the excavator is used for cleaning the pile head to a designated position, and finally the hopper of the excavator is used for removing soil between the piles. The construction safety and the construction efficiency of pile head cutting can be improved.
本申请公开了一种素混凝土桩头环切及清理方法,通过在挖机的动壁与料斗之间的连杆结构上安装切割装置,并将挖机运至施工现场,其中,切割装置包括圆锯片;然后挖机通过操控动臂,将切割装置的圆锯片摆放至水平位置,环向靠近桩头,接着启动切割装置,利用高速旋转的圆锯片切割桩头;待桩头环切完成后利用挖机的料斗将桩头清理至指定位置,最后用挖机的料斗清除桩间土。本申请有利于提高桩头切割的施工安全性和施工效率。
Plain concrete pile head girdling and cleaning method
The invention discloses a plain concrete pile head girdling and cleaning method which comprises the steps that a cutting device is installed on a connecting rod structure between a movable wall and a hopper of an excavator, the excavator is conveyed to a construction site, and the cutting device comprises a circular saw blade; then the excavator puts a circular saw blade of a cutting device to a horizontal position by controlling a movable arm, the circular saw blade is annularly close to the pile head, then the cutting device is started, and the circular saw blade rotating at a high speed is used for cutting the pile head; and after the pile head girdling is completed, a hopper of the excavator is used for cleaning the pile head to a designated position, and finally the hopper of the excavator is used for removing soil between the piles. The construction safety and the construction efficiency of pile head cutting can be improved.
本申请公开了一种素混凝土桩头环切及清理方法,通过在挖机的动壁与料斗之间的连杆结构上安装切割装置,并将挖机运至施工现场,其中,切割装置包括圆锯片;然后挖机通过操控动臂,将切割装置的圆锯片摆放至水平位置,环向靠近桩头,接着启动切割装置,利用高速旋转的圆锯片切割桩头;待桩头环切完成后利用挖机的料斗将桩头清理至指定位置,最后用挖机的料斗清除桩间土。本申请有利于提高桩头切割的施工安全性和施工效率。
Plain concrete pile head girdling and cleaning method
一种素混凝土桩头环切及清理方法
WU TETE (author) / XU HUI (author) / JIANG JINBO (author) / LIU NA (author) / HU TIANSHAN (author) / LING TANGYIN (author) / XU CHENGSHUANG (author) / BAI XIANGDONG (author) / LYU YONGGANG (author)
2023-04-07
Patent
Electronic Resource
Chinese
Method for girdling-free pile head of cast-in-place pile
European Patent Office | 2023
|Adjustable auxiliary operation platform for pile head girdling method construction
European Patent Office | 2022
|Construction method for breaking and removing virtual pile head without girdling
European Patent Office | 2022
|