A platform for research: civil engineering, architecture and urbanism
Adjustable auxiliary operation platform for pile head girdling method construction
The invention discloses an adjustable auxiliary operation platform for pile head girdling method construction. The adjustable auxiliary operation platform comprises a plurality of platform assemblies (1), telescopic supporting legs (2) and plug pins (3). The platform assemblies (1) are all of a circular ring structure, the platform assemblies (1) are sequentially spliced from inside to outside through bolts (3), and the platform assemblies (1) are concentrically arranged in the same plane to form an adjustable auxiliary operation platform body. The diameter of the inner ring of the adjustable auxiliary operation platform body is larger than the outer diameter of a pile body (4), so that the adjustable auxiliary operation platform body is arranged around the pile body (4) in a surrounding mode. The telescopic supporting legs (2) are perpendicularly connected to the bottom of the adjustable auxiliary operation platform body. The adjustable auxiliary operation platform body can be quickly spliced, and the width and the height of the adjustable auxiliary operation platform body can be adjusted according to requirements.
本发明公开了一种用于桩头环切法施工的可调式辅助操作平台,包括若干组平台组件(1)、伸缩支腿(2)和插销(3);若干组平台组件(1)均为圆环形结构,若干组平台组件(1)通过插销(3)由内向外依次拼接,且若干组平台组件(1)同心设置在同一平面内,构成可调式辅助操作平台本体;可调式辅助操作平台本体的内圈直径大于桩体(4)的外径,使可调式辅助操作平台本体环绕设置在桩体(4)的四周;多根伸缩支腿(2)分别垂直连接在可调式辅助操作平台本体的底部。本发明能可快速拼接可调式辅助操作平台本体,且能根据需求调节可调式辅助操作平台本体的宽度和高度。
Adjustable auxiliary operation platform for pile head girdling method construction
The invention discloses an adjustable auxiliary operation platform for pile head girdling method construction. The adjustable auxiliary operation platform comprises a plurality of platform assemblies (1), telescopic supporting legs (2) and plug pins (3). The platform assemblies (1) are all of a circular ring structure, the platform assemblies (1) are sequentially spliced from inside to outside through bolts (3), and the platform assemblies (1) are concentrically arranged in the same plane to form an adjustable auxiliary operation platform body. The diameter of the inner ring of the adjustable auxiliary operation platform body is larger than the outer diameter of a pile body (4), so that the adjustable auxiliary operation platform body is arranged around the pile body (4) in a surrounding mode. The telescopic supporting legs (2) are perpendicularly connected to the bottom of the adjustable auxiliary operation platform body. The adjustable auxiliary operation platform body can be quickly spliced, and the width and the height of the adjustable auxiliary operation platform body can be adjusted according to requirements.
本发明公开了一种用于桩头环切法施工的可调式辅助操作平台,包括若干组平台组件(1)、伸缩支腿(2)和插销(3);若干组平台组件(1)均为圆环形结构,若干组平台组件(1)通过插销(3)由内向外依次拼接,且若干组平台组件(1)同心设置在同一平面内,构成可调式辅助操作平台本体;可调式辅助操作平台本体的内圈直径大于桩体(4)的外径,使可调式辅助操作平台本体环绕设置在桩体(4)的四周;多根伸缩支腿(2)分别垂直连接在可调式辅助操作平台本体的底部。本发明能可快速拼接可调式辅助操作平台本体,且能根据需求调节可调式辅助操作平台本体的宽度和高度。
Adjustable auxiliary operation platform for pile head girdling method construction
用于桩头环切法施工的可调式辅助操作平台
LIU WOSHENG (author) / LIU ENZHI (author) / LI MINGYONG (author) / CHEN DONGMING (author) / LIU YIMING (author) / ZHOU SHUDONG (author) / LI PING (author) / YU GUOQING (author) / LEI ZHIFEI (author)
2022-05-24
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for breaking and removing virtual pile head without girdling
European Patent Office | 2022
|