A platform for research: civil engineering, architecture and urbanism
Inhaul cable beam end anchoring area airtight sealing structure and construction method
The invention discloses an inhaul cable beam end anchoring area air-tight sealing structure and a construction method. The construction method comprises the following steps of specification parameter calculation, cleaning, cable body correction, shock absorber installation, pressing ring installation, installation glue injection, cover body installation, cover body glue injection and bolt tightening. Sealing materials can be poured for sealing after the waterproof cover is installed, the position and the like can be adjusted at any time according to the installation condition, the construction condition requirements are few, the installation success rate is high, and the sealing performance is excellent; the rubber strip anti-skid measure is added, the problem that a conventional rubber waterproof cover slides down after being installed is solved, after buckling, the sealing material can circulate in a through channel after the waterproof cover is installed and fixed, a coherent sealing line is formed, and the problem of sealing failure caused by insufficient filling of the sealing material of the conventional rubber waterproof cover is avoided.
本发明公开了拉索梁端锚固区气密封结构及施工方法,包括以下步骤:规格参数计算、清洁、索体校正、减振器安装、压紧环安装、安装注胶、罩体安装、罩体注胶、螺栓拧紧。本发明可以在防水罩安装后才进行灌注密封材料密封,可随时根据安装情况对位置等进行调整,施工条件要求少,安装成功率高,密封性能优越;增加橡胶条防滑措施,解决了常规橡胶防水罩安装后下滑的问题,扣合后密封材料可在防水罩安装固定后在贯通的通道内流通,形成连贯的密封线,避免了常规橡胶防水罩密封材料填充不足而导致的密封失效问题。
Inhaul cable beam end anchoring area airtight sealing structure and construction method
The invention discloses an inhaul cable beam end anchoring area air-tight sealing structure and a construction method. The construction method comprises the following steps of specification parameter calculation, cleaning, cable body correction, shock absorber installation, pressing ring installation, installation glue injection, cover body installation, cover body glue injection and bolt tightening. Sealing materials can be poured for sealing after the waterproof cover is installed, the position and the like can be adjusted at any time according to the installation condition, the construction condition requirements are few, the installation success rate is high, and the sealing performance is excellent; the rubber strip anti-skid measure is added, the problem that a conventional rubber waterproof cover slides down after being installed is solved, after buckling, the sealing material can circulate in a through channel after the waterproof cover is installed and fixed, a coherent sealing line is formed, and the problem of sealing failure caused by insufficient filling of the sealing material of the conventional rubber waterproof cover is avoided.
本发明公开了拉索梁端锚固区气密封结构及施工方法,包括以下步骤:规格参数计算、清洁、索体校正、减振器安装、压紧环安装、安装注胶、罩体安装、罩体注胶、螺栓拧紧。本发明可以在防水罩安装后才进行灌注密封材料密封,可随时根据安装情况对位置等进行调整,施工条件要求少,安装成功率高,密封性能优越;增加橡胶条防滑措施,解决了常规橡胶防水罩安装后下滑的问题,扣合后密封材料可在防水罩安装固定后在贯通的通道内流通,形成连贯的密封线,避免了常规橡胶防水罩密封材料填充不足而导致的密封失效问题。
Inhaul cable beam end anchoring area airtight sealing structure and construction method
拉索梁端锚固区气密封结构及施工方法
ZHANG QIANG (author) / ZHANG XIAOPING (author) / LI BING (author) / LIU HANSHUN (author) / HUANG BOBO (author) / CAO YUCHEN (author) / WANG DONGHUI (author) / SUN MENGMENG (author) / QIN TIHAO (author) / ZOU YIQING (author)
2023-04-11
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Anchoring construction method of photovoltaic inhaul cable
European Patent Office | 2024
|European Patent Office | 2024
|Prestress flexible sealing device of inhaul cable anchoring system
European Patent Office | 2022
|Inhaul cable anchoring device and construction method thereof
European Patent Office | 2020
|